My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/23/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
06/23/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 2:07:13 PM
Creation date
9/16/2020 11:37:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/23/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTETRA TECH <br />c. Pathogen Monitoring Report for sample collected within the last two years. <br />d. Updated Operating Protocol <br />e. Flow meter calibration reports <br />f. List of reclaimed water users and copies of the reuse agreements, if needed <br />g. Annual Wetlands Report <br />h. Summary of any modifications that occurred during the current permit period, if <br />applicable. <br />i. Summary of any ongoing plant modifications, for which permits were issued for and <br />anticipated completion dates, if applicable. <br />Task 5: FDEP RAls <br />1. Tetra Tech will prepare up to two (2) responses to requests for additional information (RAls) <br />for the FDEP wastewater permit. <br />Task 6A: Process Evaluation Due to High Organic Load (Additional Services) <br />1. In accordance with Section V.B of the current permit, it was noted that the organic load to the <br />facility exceeds the design load. Per the current permit, at the time of renewal detailed <br />calculations to evaluate the capacity of the WWTF based on the high organic load are <br />required. It is believed that this requirement was a result of high loadings that were observed <br />at the WWTF at the time of the previous renewal. Subsequently, IRCDUS has mitigated the <br />source of the high loadings. The influent loadings are now consistent with the original plant <br />design. Therefore, at the FDEP Pre -Application meeting IRCDUS will request that this <br />requirement be removed upon demonstration that the loadings to the facilities are consistent <br />with the original design. If FDEP requires that this permit requirement be met as part of the <br />renewal, Tetra Tech will. prepare detailed calculations for current loadings for the existing <br />design of the WWTF. <br />2. Tetra Tech will summarize the finding in a draft technical memorandum. <br />3. Tetra Tech will meet with IRCDUS personnel to review findings. Tetra Tech will prepare and <br />distribute meeting summary to attendees. It is assumed that this meeting will be a <br />teleconference using Microsoft teams or similar app. <br />4. Tetra Tech will finalize the technical memorandum in the Capacity Analysis Report (Task 9A). <br />125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.