My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/23/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
06/23/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 2:07:13 PM
Creation date
9/16/2020 11:37:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/23/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTETRA TECH <br />Task 7A: Capacity Analysis Report (Additional Services) <br />1. Per Chapter 62-600, F.A.C. in accordance with Section V.B of the current permit. Although the <br />WWTF three-month average daily flow has not exceeded 50% of the permitted capacity, due <br />to high organic load that exceeds the design for the WWTF an updated capacity analysis <br />report is required with the permit application. It is believed that this requirement was a result <br />of high loadings that were observed at the WWTF at the time of the previous renewal. <br />Subsequently, IRCDUS has mitigated the source of the high loadings. The influent loadings are <br />now consistent with the original plant design. Therefore, at the FDEP Pre -Application meeting <br />IRCDUS will request that this requirement be removed upon demonstration that the loadings <br />to the facilities are consistent with the original design. If FDEP requires that this permit <br />requirement be met as part of the renewal, Tetra Tech will prepare a Capacity Analysis <br />Report. <br />2. Develop flow projections for the next 10 -years based on historical wastewater flows and <br />population projections provided by IRCDUS. <br />3. Tetra Tech will summarize the finding in a draft technical memorandum. <br />4. Tetra Tech will meet with IRCDUS personnel to review findings. Tetra Tech will prepare and <br />distribute meeting summary to attendees. <br />5. Tetra Tech will finalize the technical memorandum in the Capacity Analysis Report. <br />S.. Tetra Tech will prepare a draft Capacity Analysis Report (CAR) Tetra Tech will meet with <br />IRCDUS personnel to review findings. Tetra Tech will prepare and distribute meeting summary <br />to attendees. It is assumed that if required, the Capacity Analysis Report review meeting will <br />occur at the same time as the Operations Maintenance and Performance Report review <br />meeting. <br />6. Tetra Tech will finalize report to be submitted to FDEP. <br />Task 8A: Biosolids Storage Plan (Additional Services) <br />1. IRCDUS does not currently have a Facility Biosolids Storage Plan. IRCDUS West Regional <br />WWTF transfers its biosolids to Indian River County Biosolids Dewatering Facility and has not <br />been required to submit one to FDEP in the past. FDEP has required getting an approved <br />Facility Biosolids Plan on recent permit renewals for other facilities. If required by FDEP, Tetra <br />Tech will assist IRCDUS develop a Facilities Biosolids Plan which will include a summary of the <br />biosolids unit processes, disposal, and process back-up provisions. <br />126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.