Laserfiche WebLink
CHANGE ORDER NO.2 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: CR 512 Resurfacing & Shoulder Widening from Myrtle Street to 125th Avenue Project <br />PROJECT NOS. IRC -1305 BID NO. 2018009 FM NO. 433068-1-54-01 <br />..Item No. <br />Description <br />Unit Quantity <br />Unit Price <br />Price Increase <br />Price Decrease <br />102-99 <br />PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY <br />ED <br />366.00 <br />13.97 <br />5,113.02 <br />120.1 <br />REGULAR EXCAVATION <br />CY <br />195.07 <br />32.26 - <br />G,292.96 <br />160-4 <br />TYPE B STABILIZATION <br />SY <br />514.11 <br />7.08 <br />3,639+90 <br />285-706 <br />OPTIONAL BASE BASE GROUP 06 <br />SY <br />80.22 <br />66.84 <br />5,361.90 <br />327-70-6 <br />IMILLING EXISTASPH PAVT 1-1/2"'AVG DEPTH <br />SY <br />1 1,485.71 <br />1 3.45 <br />5125.70 <br />520-1-10 <br />CONCRETE CURB & GUTTER TYPE F <br />LF <br />68.00 <br />1 58.23 <br />3,959.64 <br />522-2 <br />CONCRETE SIDEWALK AND DRIVEWAYS 8"THICK <br />SY <br />423.61 <br />98.99 <br />41933.15 <br />527-2 <br />DETECTABLE WARNINGS <br />SF <br />72.40 <br />25.00 <br />1,810.00 <br />630.2-11 -. <br />CONDUIT FURNISH & INSTALL OPEN TRENCH <br />LF <br />56.00 <br />6.11 <br />342.16 <br />630-2-12 <br />1CONDUIT. FURNISH & INSTALL DIRECTIONAL BORE <br />LF <br />7.00 <br />20.38 <br />142.66 <br />635-2-11 <br />PULL & SPLICE BOX F&I 13"x 24" COVER SIZE <br />EA <br />5.00 <br />1 582.28 <br />2,911.40 <br />706.3 <br />RETRO-REFLECTIVE PAVEMENT MARKER <br />EA <br />97.00 <br />1 3.49 <br />338.53 <br />711.11-123 <br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR <br />CROSSWALK OR ROUNDABOUT <br />LF <br />302.00 <br />1.86 <br />561.72 <br />711.11-170 <br />THERMOPLASTIC STANDARD WHITE ARROWS <br />EA <br />2.00 <br />69.87 <br />139.74 <br />711-11-224 <br />THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR <br />IDIAGONAL OR CHEVRON <br />LF <br />-129.00 <br />2.91 <br />375.39 <br />711-16-101 <br />THERMOPLASTIC, STANDARD -OTHER SURFACES, WHITE, <br />OLID 6- <br />SOLID, <br />GM <br />0.10 <br />5694.66 <br />569.47 <br />711-16-201 <br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW, <br />SOLID 8' <br />GM <br />0.04 <br />1 5694.66 <br />239.18 <br />WCD 2' <br />SILT FENCE RELOCATION <br />LS <br />1.00 <br />600.00 <br />600.00 <br />WCD 3 <br />MOT FOR CORES <br />LS <br />1.00 <br />3302.88 <br />3302.89 <br />WCD5 <br />CURB <br />LS <br />1.00 <br />3314.23 <br />3314.23 <br />WCD6 <br />BOYS AND GIRLS CLUB <br />LS <br />1.00 <br />21253.54 <br />21253.54 <br />110.1-1 <br />CLEARING & GRUBBING <br />AC <br />10,6312' <br />0.63 <br />2025.21 <br />21527.98 <br />120-6 <br />EMBANKMENT <br />CY <br />243.67 <br />1.16 <br />282.66 <br />285-701 <br />OPTIONAL BASE, BASE GROUP 01 <br />SY <br />511.09 <br />26.91 <br />13 753.43 <br />337-7-81 <br />ASPHALT CONCRETE FRICTION COURSE (TRAFFIC B, FC -12.5, <br />PG 78-22 <br />TN <br />39.97 <br />127.85 <br />5,110.16 <br />430-174-112 <br />PIPE CULVERT ROUND 12" SD C.M.P. <br />LF <br />21.00 <br />174.68 <br />3,668.28 <br />570-1-2 <br />PERFORMANCE TURF' SOD BAH IA <br />BY <br />1 3085.00 <br />4.06 <br />12525.10 <br />633-3-11 <br />FIBER OPTIC CONNECTION HARDWARE, F&I, SPLICE <br />ENCLOSURE <br />EA <br />1.00 <br />756.96 <br />756.96 <br />700-1-11 <br />SINGLE POST SIGN F&I GM < 12 SF - <br />AS <br />1.00 <br />465.62 <br />465.82 <br />700-1-50 <br />SINGLE POST SIGN RELOCATE <br />AS <br />2.00 <br />349.37 <br />.698.74 <br />711-11-125 <br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 24- FOR STOP <br />LINES OR CROSSWALK <br />LF <br />85.00 <br />4.08 <br />346.80 <br />711-11-141 <br />THERMOPLASTIC, STANDARD, WHITE, 2.4 DOTTED <br />GUIDELINE/6-10 GAP EXTENSION 6" <br />GM <br />0.02 <br />1310.12 <br />20.96 <br />711-16-202 <br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW, <br />SOLID 8- <br />GM <br />0.03 <br />7394.90 <br />221.85 <br />711.16-231 <br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW, <br />SKIP 10-30 B" - <br />GM <br />0.13 <br />184.87 <br />_1,455.69 <br />FA <br />FORCE ACCOUNT <br />LS <br />1 <br />75 000.00 <br />75 000.00 <br />SUBTOTALS <br />I <br />1 <br />1 107,327.18 <br />.134,563.62 <br />CR 512 Resurfacing <br />& Shoulder Widening from Myrtle Street to 125th Avenue Project <br />TOTAL <br />27.236.44 <br />F.V It W.Aa ERCIREERIr DIIISIORPROJCTS\t] R512Rnu(I P)_M1,n6S1129n51\1+km"nN .ttwmWgxt LlwwuURC-1A5_CO2_A200ED <br />146 <br />