Laserfiche WebLink
ENGINEERING <br />Survey Crew <br />28 hrs ® <br />�x <br />$1,059.24 <br />FINAL COST FOR: <br />7 hrs ® <br />FRANGIPANI DRIVE FROM CR510 TO MAGNOLIA DRIVE <br />DATE: 6/29/92 <br />Drafting <br />PROJECT NO. 8845 <br />TOTAL L.F. 1900 <br />$1,191.12 <br />TOTAL F.F. 3660 <br />FINAL COST <br />$25.26 <br />Labor <br />$10,150.57 <br />Equipment <br />$16,731.00 <br />Soil Cement <br />$12,644.25 <br />Asphalt <br />$12,211.66 <br />Sod <br />$5,314.07 <br />Landfill <br />$201.40 <br />Limerock <br />$6,664.60 <br />Marl <br />$2,002.00 <br />Testing <br />$150.00 <br />$66,069.55 <br />ENGINEERING <br />Survey Crew <br />28 hrs ® <br />$37.83 <br />$1,059.24 <br />Chief Surveyor <br />7 hrs ® <br />$25.30 <br />$177.10 <br />Drafting <br />84 hrs ® <br />$14.18 <br />$1,191.12 <br />Design <br />80 hrs ® <br />$25.26 <br />$2,020.80 <br />Construction <br />Stake Out <br />11 hrs® <br />$25.30 <br />$279.30 <br />$66,069.55 <br />$4,726.56 $4,726.56 <br />Sub -Total $10,796.11 <br />Administration 3.012270% <br />$2,132.57 <br />Recording Fees <br />367.00 <br />TOTAL $73,295.68 <br />75 % Property Owner's Assessment <br />$54,971.76 <br />2% Tax Collector's Fee (75% Figure) <br />SI 09944 <br />TOTAL ASSESSMENT $56,071.20 <br />Assessment = $56.071.20 = $15.32 <br />3660 <br />FRANFIN.wk1 29 -Jun -92 <br />