Laserfiche WebLink
responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />means, method, technique, sequence, or procedure <br />of construction which is shown or indicated in and <br />expressly required by the Contract Documents. <br />CONTRACTOR shall be responsible to see that the <br />completed Work complies accurately with the <br />Contract Documents. <br />B. At all times during the progress of the Work, <br />CONTRACTOR shall assign a competent resident <br />superintendent thereto who shall not be replaced <br />without written notice to OWNER and ENGINEER <br />except under extraordinary circumstances. The <br />superintendent will be CONTRACTOR's <br />representative at the Site and shall have authority to <br />act on behalf of CONTRACTOR. All communications <br />given to or received from the superintendent shall be <br />binding on CONTRACTOR. <br />6.02 Labor, Working Hours <br />A. CONTRACTOR shall provide competent, <br />suitably qualified personnel to survey, lay out, and <br />construct the Work as required by the Contract Docu- <br />ments. CONTRACTOR shall at all times maintain <br />good discipline and order at the Site. <br />B. Except as otherwise required for the safety or <br />protection of persons or the Work or property at the <br />Site or adjacent thereto, and except as otherwise <br />stated in the Contract Documents, all Work at the Site <br />shall be performed during regular working hours, and <br />CONTRACTOR will not permit overtime work or the <br />performance of Worts on Saturday, Sunday, or any <br />legal holiday without OWNER's written consent <br />(which will not be unreasonably withheld) given after <br />prior written notice to ENGINEER. <br />6.03 Services, Materials, and Equipment <br />A. Unless otherwise specified in the General <br />Requirements, � CONTRACTOR shall provide and <br />assume full responsibility for all services, materials, <br />equipment, labor, transportation, construction <br />equipment and machinery, tools, appliances, fuel, <br />power, light, heat, telephone, water, sanitary facilities, <br />temporary facilities, and all other facilities and <br />incidentals necessary for the performance, testing, <br />start-up, and completion of the Work. <br />B. All materials and equipment incorporated into <br />the Work shall be as specified or, if not specified, <br />shall be of good quality and new, except as otherwise <br />provided in the Contract Documents. All warranties <br />and guarantees specifically called for by the <br />Specifications shall expressly run to the benefit of <br />OWNER. If required by ENGINEER, CONTRACTOR <br />shall furnish satisfactory evidence (including reports <br />of required tests) as to the source, kind, and quality of <br />materials and equipment. All materials and <br />equipment shall be stored, applied, installed, <br />connected, erected, protected, used, cleaned, and <br />conditioned in accordance with instructions of the <br />applicable Supplier, except as otherwise may be <br />provided in the Contract Documents. <br />6.04 Progress Schedule <br />A. CONTRACTOR shall adhere to the progress <br />schedule established in accordance with paragraph <br />2.07 as it may be adjusted from time to time as <br />provided below. <br />1. CONTRACTOR shall submit to <br />ENGINEER for acceptance (to the extent indi- <br />cated in paragraph 2.07) proposed <br />adjustments in the progress schedule that will <br />not result in changing the Contract Times (or <br />Milestones). Such adjustments will conform <br />generally to the progress schedule then in <br />effect and additionally will comply with any <br />provisions of the General Requirements <br />applicable thereto. <br />2. Proposed adjustments in the <br />progress schedule that will change the <br />Contract Times (or Milestones) shall be <br />submitted in accordance with the requirements <br />of Article 12. Such adjustments may only be <br />made by a Change Order or Written Amend- <br />ment in accordance with Article 12. <br />6.05 Substitutes and "Or -Equals" <br />A. Whenever an item of material or equipment is <br />specified or described in the Contract Documents by <br />using the name of a proprietary item or the name of a <br />particular Supplier, the specification or description is <br />intended to establish the type, function, appearance, <br />and quality required. Unless the specification or <br />description contains or is followed by words reading <br />that no like, equivalent, or "or -equal" item or no <br />substitution is permitted, other items of material or <br />equipment or material or equipment of other Suppliers <br />may be submitted to ENGINEER for review under the <br />circumstances described below. <br />1. "Or -Equal" Items: If in ENGINEER's <br />sole discretion an item of material or equip- <br />ment proposed by CONTRACTOR is function- <br />ally equal to that named and sufficiently similar <br />so that no change in related Work will be <br />required, it may be considered by ENGINEER <br />00700 - General Conditions REV 5-10-13 <br />00700-19 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1727 CR -512 EB & WB Bridge (88407879) Repairs\1-Admin\Bid Documents\Nlaster Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />