My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:09:12 AM
Creation date
10/1/2020 10:55:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2020
Control Number
2020-159A
Agenda Item Number
8.AM.
Entity Name
Proshot Concrete, Inc.
Subject
CR 512 Bridge Repairs
FDOT 884078 & 884079
Project Number
IRC-1727
Bid Number
2020048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as an "or -equal" item, in which case review and <br />approval of the proposed item may, in <br />ENGINEER's sole discretion, be accomplished <br />without compliance with some or all of the <br />requirements for approval of proposed substi- <br />tute items. For the purposes of this paragraph <br />6.05.A.1, a proposed item of material or <br />equipment will be considered functionally equal <br />to an item so named if: <br />a. in the exercise of reasonable <br />judgment ENGINEER determines that: (i) it <br />is at least equal in quality, durability, <br />appearance, strength, and design <br />characteristics; (ii) it will reliably perform at <br />least equally well the function imposed by <br />the design concept of the completed Project <br />as a functioning whole, and; <br />b. CONTRACTOR certifies that: (i) <br />there is no increase in cost to the OWNER; <br />and (ii) it will conform substantially, even <br />with deviations, to the detailed requirements <br />of the item named in the Contract <br />Documents. <br />2. Substitute Items <br />a. If in ENGINEER's sole discretion an <br />item of material or equipment proposed by <br />CONTRACTOR does not qualify as an <br />"or -equal" item under paragraph 6.05.A.1, it <br />will be considered a proposed substitute <br />item. <br />b. CONTRACTOR shall submit suffi- <br />cient information as provided below to allow <br />ENGINEER to determine that the item of <br />material or equipment proposed is <br />essentially equivalent to that named and an <br />acceptable substitute therefor. Requests <br />for review of proposed substitute items of <br />material or equipment will not be accepted <br />by ENGINEER from anyone other than <br />CONTRACTOR. <br />c. The procedure for review by ENGI- <br />NEER will be as set forth in paragraph <br />6.05.A.2.d, as supplemented in the General <br />Requirements and as ENGINEER may <br />decide is appropriate under the <br />circumstances. <br />d. CONTRACTOR shall first make <br />written application to ENGINEER for review <br />of a proposed substitute item of material or <br />equipment that CONTRACTOR seeks to <br />furnish or use. The application shall certify <br />that the proposed substitute item will <br />perform adequately the functions and <br />achieve the results called for by the general <br />design, be similar in substance to that <br />specified, and be suited to the same use as <br />that specified. The application will state the <br />extent, if any, to which the use of the pro- <br />posed substitute item will prejudice <br />CONTRACTOR's achievement of Substan- <br />tial Completion on time, whether or not use <br />of the proposed substitute item in the Work <br />will require a change in any of the Contract <br />Documents (or in the provisions of any <br />other direct contract with OWNER for work <br />on the Project) to adapt the design to the <br />proposed substitute item and whether or <br />not incorporation or use of the proposed <br />substitute item in connection with the Work <br />is subject to payment of any license fee or <br />royalty. All variations of the proposed <br />substitute item from that specified will be <br />identified in the application, and available <br />engineering, sales, maintenance, repair, <br />and replacement services will be indicated. <br />The application will also contain an <br />itemized estimate of all costs or credits that <br />will result directly or indirectly from use of <br />such substitute item, including costs of <br />redesign and claims of other contractors <br />affected by any resulting change, all of <br />which will be considered by ENGINEER in <br />evaluating the proposed substitute item. <br />ENGINEER may require CONTRACTOR to <br />furnish additional data about the proposed <br />substitute item. <br />B. Substitute Construction Methods or Proce- <br />dures: If a specific means, method, technique, se- <br />quence, or procedure of construction is shown or <br />indicated in and expressly required by the Contract <br />Documents, CONTRACTOR may furnish or utilize a <br />substitute means, method, technique, sequence, or <br />procedure of construction approved by ENGINEER. <br />CONTRACTOR shall submit sufficient information to <br />allow ENGINEER, in ENGINEER's sole discretion, to <br />determine that the substitute proposed is equivalent <br />to that expressly called for by the Contract Docu- <br />ments. The procedure for review by ENGINEER will <br />be similar to that provided in subparagraph 6.05.A.2. <br />C. Engineers Evaluation: ENGINEER will be <br />allowed a reasonable time within which to evaluate <br />each proposal or submittal made pursuant to para- <br />graphs 6.05.A and 6.05.6. ENGINEER will be the <br />sole judge of acceptability. No "or -equal" or substitute <br />will be ordered, installed or utilized until ENGINEER's <br />00700 - General Conditions REV 5-10-13 <br />00700-20 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS11727 CR -512 EB & WB Bridge (88407879) RepairsN-Admin\Bid DocumentsWaster Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.