Laserfiche WebLink
Division 1— General Requirements, IRC -1801A <br />H. When finished surfaces require cleaning with cleaning materials, use only those <br />cleaning materials which will not create hazards to health or property and which <br />will not damage the surfaces. Use cleaning materials only on those surfaces <br />recommended by the manufacturer. Follow the manufacturer's directions and <br />recommendations at all times. <br />I. Keep the amount of dust produced during construction activities to a minimum. <br />At CONTRACTOR's expense, spray water or other dust control agents over the <br />areas, which are producing the dust. Schedule construction operations so that <br />dust and other contaminants will not fall on wet or newly coated surfaces. <br />1.3 SITE CLEANUP AND RESTORATION <br />Prior to final completion, the OWNER, ENGINEER, and CONTRACTOR shall review the site <br />with regards to site cleanup and restoration. Clean and/or restore all items determined <br />to be unsatisfactory by the OWNER or ENGINEER, at no additional expense. <br />+ + END OF SECTION + + <br />Site Cleanup and Restoration - 01710-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1801A IRC Courthouse Parking Garage Rehabilitation\1-Admin\Bids\Bid Documents\Bid Dcuments\DIV 1 GENERAL <br />REQUIREMENTS.docx <br />