Bid Number 2020056 <br />Addendum No. 2 <br />Page 3 of 3 <br />Question 12. Section 01050- Field Engineering and Layout requires the contractor to confirm all surveys, <br />install station boards, layout all striping by instrument, and provide as -built drawings. Confirming all are <br />required for this project? <br />Response: The Contractor is required to supply as -built drawing as part of his/her project close out. <br />Question 13. Does contractor need to submit material substitutions prior to submittal of bid? <br />Response: Bids shall be submitted per plans and specifications. <br />Question 14. Does contractor need to submit all application certifications with bid form? <br />Response: No. <br />Question 15. Should Contractor expect lead-based paint on site? <br />Response: No. <br />Question 16. Are we coating the backside of the knee wall and all other exposed concrete at the top <br />level? <br />Engineer's Response: Yes <br />Question 17. On drawing S201, note 2 it refers to removing and replacing sealant but all points reflected <br />do not currently have any in place. Is it your intent to seal all vertical and horizontal joints? <br />Response: Yes <br />Attachments: <br />Revised Itemized Bid Schedule <br />Addendum 2 Cover Letter from REI Engineers including Specification revisions and Plan revisions. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1801A IRC Courthouse Parking Garage Rehabi1itation\1-Admin\13ids\Bid Documents\Bid <br />Dcuments\Addendums\Add-2\Bid2020056 IRC -1838 ADD -2 2020826.docx <br />