My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 82 <br />Attachment D <br />TECO. TWENTYSIXT#SEVENTH REVISED SHEET N0.6.080 <br />CANCELS TWENTY FIFTH SIXTH REVISED SHEET NO. <br />AdrA TAMPA ELECTRIC <br />AN EMERA COMPANY <br />GENERAL SERVICE -DEMAND <br />SCHEDULE: GSD <br />AVAILABLE: Entire service area. <br />APPLICABLE: To any customer whose energy consumption has exceeded 9,000 kWh in any <br />one of the prior twelve (12) consecutive billing periods ending with the current billing period. <br />Also available to customers with energy consumption at any level below 9,000 kWh per billing <br />period who agree to remain on this rate for at least twelve (12) months. For any billing .period <br />that exceeds 35 days, the energy consumption shall be prorated to that of a 30 -day amount for <br />purposes of administering this requirement. Resale not permitted. <br />CHARACTER OF SERVICE: A -C; 60 cycles; 3 phase; at any standard Company voltage: <br />LIMITATION OF SERVICE: Standby service is permitted only for customers who generate <br />less than 20% of their on-site load requirements or whose generating equipment is us for <br />emergency purposes. <br />MONTHLY RATE: <br />STANDARD OPTIONAL <br />Basic Service Charge: <br />Secondary Metering Voltage $ 30.10 <br />Primary Metering Voltage $ 130.44 <br />Subtrans. Metering Voltage $ 993.27 <br />Basic Service Charge: <br />Secondary Metering Voltage $ 30.10 <br />Primary Metering Voltage $ 130.44 <br />Subtrans. Metering Voltage $ 993.27 <br />Demand Chame: Demand Charge - <br />$44 -03 <br />,10_.76 <br />harge:$10.76 per kW of billing demand $0.00 per kW of billing demand <br />Energy.Charae: <br />1.589¢ per kVVh <br />Energy Charge: <br />6.658585¢ per kWh <br />.The customer may select either standard or ,optional. Once an option is selected, the <br />customer must remain on that option for twelve (12) consecutive months. <br />Continued to Sheet NO. .6.081 <br />ISSUED BY. N.G.'Tower, President <br />DATE EFFECTIVE: --anwaiy 429219 <br />(711-617 <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.