Laserfiche WebLink
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 83 <br />Attachment D <br />Aftk <br />TE`1100: TWE{VTYA#=FIFTH REVISED SHEET NO `:6 085 <br />CANCELS THI/ENTY-_H194.FOURTH REVISED SHEET <br />. -r MPA ELECTRic p O <br />>AN;EMERA CEIMPANY NO -6.085_ <br />INTERRUPTIBLE SERVICE <br />(CLOSED TO NEW BUSINESS AS OF MAY T,2699) <br />(SCHEDULE IS <br />AVAILABLE: Entire. Service Area. <br />APPLICABLE: To be eligible for service under Rate Schedule 1S, a customer must have <br />been taking interruptible service under rate schedules IS -1, IST -1, IS -3, IST -3, SBI -1, or SBI -3 <br />on. May 6, 2009 and have signed the Agreement for the Purchase of Industrial Load <br />Management Service under Rate Schedule GSLM 2. When electric service is desired at more <br />than one location, each such location or point Of delivery shall be considered as a separate'. <br />customer. Resale not permitted. <br />CHARACTER OF SERVICE. The electric energy supplied under this schedule is three' <br />phase primary voltage or h:ighot <br />LIMITATION OF SERVICE: Standby service is permitted only for customers who <br />generate less than 20% of their on-site load requirements or whose generating equipment is', <br />used for emergency purposes. <br />MONTHLY RATE: <br />Basic Service Charge: <br />Primary Metering Voltage $ 6.24.05 <br />Subtransmission Metering Voltage $2;379.85 <br />'Demand Charge:. <br />$3.90 per KW of billing demand <br />Energy Charlie: <br />2.51'3.¢ per KWH, <br />Continued to Sheet No. 6.086 <br />........... <br />ISSUEDBY: N.'G. Tower;• President <br />DATE EFFECTIVE ! ^:Q ) l Q" �^ <br />