My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 84 <br />Attachment D <br />TE % THIRTY -SECO B -THIRD REVISED SHEET NO 6.290 <br />CANCELS TIIRTYT=SECOND REVISED SHEET NO. <br />':1"AMPA ELEC:`TFLIC -6.290 <br />AN EMERA COMPANY <br />:CONSTRUC'T'ION SERVICE <br />SCHEDULE: CS <br />AVAILABLE: Entire service area. <br />J APPLICABLE: Single phase temporary service used primarily for construction purposes. <br />LIMITATION OF SERVICE: Service is limited to construction poles and services installed <br />Under the TUG program. Construction poles are limited to a maximum of 70 amperes at 240 <br />volts for construction poles. Larger (non -TUG) services and three phase service entrances <br />must be served under the appropriate rate schedule, plus the cost of installing and removing <br />the temporary facilities is required. <br />MONTHLY RATE: <br />Basic Service Charge: $18.06 <br />Enercgy and Demand Charge:.$44444i3¢_ per kWh <br />MINIMUM CHARGE: The Basic.Serviee Charge. <br />FUEL CHARGE: See Sheet Nos. 6:020, and 6.021. <br />ENERGY CONSERVATION CHARGE See Sheet Nos.'6:020 and 6.021:. <br />CAPACITY. CHARGE: See Sheet Nos. 6:020 and 6.021. <br />ENVIRONMENTAL COST RECOVERY CHARGE: :See Sheet Nos. 6,020 and 6.021. <br />FLORIDA GROSS RECEIPTS TAX: Sheet No. 6.021, <br />FRANCHISE FEE CHARGE: See Sheet No. 6.021. <br />MISCELLANEOUS: A Temporary Service Charge of $260:00 shall be paid upon application <br />for the recovery of costs associated with providing, installing, and removing the company's' <br />temporary service facilities for construction poles. Where the Company is required to provide <br />additional facilities other than a service drop or connection point to the Company's existing <br />distribution system, the customer shall also pay, in advance, for the estimated cost of'. <br />providing, installing and removing such additional facilities, excluding the cost of any portion of <br />these facilities which will remain as a part of the permanent service. <br />PAYMENT OF BILLS: See Sheet No. 6.022. <br />ISSUED BY: N. G. Tower, President <br />DATE EFFECTIVE: danwaiy4 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.