Laserfiche WebLink
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 89 <br />Attachment D <br />Am <br />-F C'�T, ,.-.o^'vIXTEE11iTH REVISED SHEET NO. 6.600 <br />- CANCELS F4311RTCEAlTu FIFTEENTH REVISED SHEET <br />'T'AMPA ELECTRIC 6.600 <br />FIRM <br />AN EMERA COMPANY <br />FIRM STANDBY AND SUPPLEMENTAL SERVICE <br />SCHEDULE: :SBF <br />AVAILABLE; Entire service area. <br />APPLICABLE: Required for all self -generating Customers whose generating capacity in <br />kilowatts (exclusive of emergency generation equipment) exceeds 20% of their site load in <br />kilowatts and. who take firm service from the utility. Also available to self -generating <br />Customers whose generating capacity in kilowatts does not exceed 20% of their site load in <br />kilowatts, but who agree to all the terms and conditions of this rate schedule. Resale not <br />permitted.. <br />CHARACTER OF SERVICE: A -C; 60 cycles; 3 phase; at any standard company voltage. <br />LIMITATION OF SERVICE: A customer taking service under this tariff must sign a Tariff <br />Agreement for the Purchase of Firm Standby and Supplemental Service. (See Sheet No. <br />7;600) <br />MONTHLY RATE: <br />Basic Service Charge: <br />Secondary Metering Voltage $ 55.18 <br />Primary Metering Voltage $ 155.51 <br />Subtransmission Metering Voltage $1,018.36 <br />CHARGES FOR STANDBY SERVICE: <br />Demand Charge: <br />$ 1:&568 per kW -Month .of Standby Demand <br />(Local Facilities. Reservation Charge) <br />plus the greater of: <br />$ 1.55 per kW -Month of Standby Demand <br />(Power Supply Reservation Charge) or <br />$ 0.62 per kW -Day of Actual Standby Billing Demand <br />(Power Supply Demand Charge) <br />Energy Char-ge: <br />cl,bvo per Standby kWh <br />Continued to Sheet No. 6.601 <br />ISSUED BY: N. G. Tower; President <br />DATE EFFECTIVE:ac nw y 4, 2QQ <br />