My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 90 <br />Attachment D <br />Am <br />44g4iTccniTu c(GHTEENTi-I REVISEb SHEET NO; <br />TEC: <br />Afi.fi01 <br />TAMPA ELECTRIC EVENTEENTHREVISED SHEET; <br />AN EMERA GO MPANX <br />CANCELS CIYTCCAITLJ'C <br />. NO. ;6.601 <br />CHARGES FOR SUPPLEMENTAL SERVICE: <br />Demand':.Gfiarae <br />$11=810 76' per .In. -. Month of Supplemental Billing Demand' (Supplemental Billing <br />Demand Charge} <br />Energy Charge: ' <br />1.584 per Supplemental kWh <br />DEFINITIONS OF `THE USE PERIODS: All time periods staI.ted in clock time. {Meters are <br />programmed to automatically adjust for changes from standard`.to daylight saving time .and'. <br />vice=versa.) <br />April 1.October 31 November <br />'I - March 31 <br />Peak Hours: 12:00 Noon 5:00 PM 6:00 AM -10`00 AM <br />(Monday-Friday)and <br />6:00 PM -10:00 'PM <br />Off -Peak Hours: All other weekday hours, and all hours on Saturdays, Sundays, New <br />Year's Day, Memorial Day; Independence Day, Labor Day, Thanksgiving Day and Christmas' <br />Day shall be off=peak. <br />BILLING UNITS: <br />Demand. Units.;: Metered Demand - The highest measured 30 -minute interval kW demand <br />served by the company during the "month. <br />Site Load -The highest kW total of Customer generation plus deliveries'by' <br />the company less deliveries to the Company, occurring in the same 30- <br />minute interval, during the month, <br />Normal Generation - The :generation level equaled or :exceeded by the <br />Customer's generation 10% of the metered intervals during the: previous <br />twelve months. <br />Supplemental Billing Demand - The :amount, if any, by which the Highest <br />Site Load during any ;30 -minute interval in the month exceeds Normal <br />Generation, but no greater than Metered Demand. <br />Continued to Shoe <br />ISSUED BY: N G,'Tower,:.President <br />DATE EFFECTIVE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.