Mr. Himanshu H. Mehta, P.E. <br />25 September 2020 <br />Page 10 <br />A single round of groundwater samples will be collected initially from each of the four (4) new <br />evaluation monitoring wells for the parameters as required by paragraphs 62-701.510(5)(a) and <br />(c), F.A.C. It is currently planned that this sampling will be performed during the same <br />mobilization as the October 2020 C&D debris disposal facility evaluation monitoring. <br />Coincident with the evaluation groundwater monitoring, surface water samples will also be <br />collected from sampling locations C5 -SWI and C5-SW3 and field screened for pH. A single <br />sample total ammonia nitrogen (TAN) value will be calculated at each evaluation monitoring <br />location using the average pH and temperature from the contemporaneously collected surface <br />water samples from sampling locations C5 -SWI and C5-SW3. Subsequent rounds of quarterly <br />evaluation groundwater monitoring for the parameters as required by paragraph 62- <br />701.510(5)(a), F.A.C. will be completed, however, the charges associated with these events will <br />be included in our 2021 groundwater monitoring proposal <br />Geosyntec will oversee the evaluation monitoring well installation. The subcontracted driller <br />will be JAEE of Davie, Florida. Geosyntec will install a staff gauge at the surface water <br />sampling locations C5 -SWI and C5-SW3. Peavy. & Associates Survey & Mapping, PA (Peavy) <br />will conduct a top -of -casing survey at the three (3) new evaluation monitoring wells and survey <br />the two (2) new staff gauges. Geosyntec will subcontract the field sampling activities to Ideal <br />Technical Services. Analytical testing will be conducted by ENCO Laboratories (ENCO) of <br />Orlando, Florida, the analytical laboratory contracted with, and direct bill to, SWDD. The <br />results of the October 2020 quarterly evaluation water -quality monitoring event will be reported <br />to FDEP within 60 days of receipt of analysis from the laboratory. <br />Geosyntec assumes the areas where the evaluation monitoring wells need to be installed will be <br />cleared by SWDD and SWDD will provide assurance the drilling areas are clear of subsurface <br />utilities; otherwise, a subsurface utility survey will be performed prior to initiating work. <br />SCHEDULE <br />Geosyntec will initiate work immediately upon receipt of Notice to Proceed (NTP) from SWDD. <br />The compliance reports required by each permit will be completed and submitted to FDEP <br />before the deadlines discussed above. Other technical and miscellaneous permit compliance <br />support services will be provided on an as -needed basis. <br />BUDGET ESTIMATE <br />Geosyntec proposes to perform the above -referenced work on a lump sum basis for $134,972.70. <br />A budget estimate for the scope of work outlined in Phases 1 through 4 of this proposal <br />is summarized in the following table, and a detailed budget estimate is provided as Attachment <br />1. The budget estimate presented in this proposal is based on Geosyntec's understanding of <br />NCP2020_3158/JL200925 2020 Compliance Monitoring Proposal <br />