My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-221
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 12:35:28 PM
Creation date
10/20/2020 3:20:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/13/2020
Control Number
2020-221
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
CCNA2018 Work Order 8
Area
Engineering Services w/ 2020 Groundwater Technical Support Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />25 September 2020 <br />Page 9 <br />will re -install staff gauges at the surface water sampling locations LC-SW5 and LC-SW6. Peavy <br />& Associates Survey & Mapping, PA (Peavy) will conduct a top -of -casing survey at the three (3) <br />new evaluation monitoring wells and survey the two (2) re -installed staff gauges. Geosyntec will <br />subcontract the field sampling activities to Ideal Technical Services (ITS). ITS is currently <br />performing the sampling for the semi-annual compliance and quarterly assessment monitoring <br />events at the IRCL facility. Where noted, the agronomic analytical analysis will be completed <br />by ServiTech of Dodge City, Kansas. The other analytical testing will be conducted by ENCO <br />Laboratories (ENCO) of Orlando, Florida, the analytical laboratory contracted with, and direct <br />bill to, SWDD. <br />A work plan detailing the scope of work detailed in this task will be provided to FDEP for <br />approval at least 45 days prior to anticipated, start date of the scope of work detailed in this Task. <br />The results of the initial temporary piezometer water -quality monitoring event will be integrated <br />into the October 2020 quarterly assessment report for the C&D debris disposal facility and will <br />be reported to FDEP within 60 days of receipt of analysis from the laboratory. The technical <br />memorandum will be submitted to FDEP within 90 days of receipt of analytical data. <br />Geosyntec assumes the areas where the groundwater screening and temporary piezometers need <br />to be installed will be cleared by SWDD and SWDD will provide assurance that the drilling <br />areas are clear of subsurface utilities; otherwise, a subsurface utility survey will be performed <br />prior to initiating work. <br />Phase 4 —Class I Landfill Evaluation Monitoring <br />The installation and sampling of four (4) evaluation monitoring wells is required per <br />correspondence with FDEP dated 17 September 2020 as noted above. The evaluation <br />monitoring wells must be installed at the edge of the zone of discharge (ZOD) which is located <br />100 ft from the edge of waste and downgradient of existing detection monitoring wells: MW -3S, <br />MW -14S, MW -44S and MW -44I. The evaluation monitoring wells will be installed with <br />identical construction to the detection monitoring wells where the evaluation monitoring is to <br />occur. <br />The evaluation monitoring wells will be installed using HSA methods and constructed of 2 -in. <br />diameter SCH 40 PVC well materials including a 10 -slot (0.001 -in.) screen including a 20/30 <br />graded silica sand filter pack, 30/65 graded silica sand seal and cement grout slurry to surface. <br />Each evaluation monitoring well will be completed with an above ground protective casing and <br />three steel bollards and will be developed for a period of one hour either prior to grouting or at <br />least 24 hours after grouting. <br />NCP2020 3158/JL200925 2020 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.