My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-221
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 12:35:28 PM
Creation date
10/20/2020 3:20:22 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />25 September 2020 <br />Page 7 <br />Figure 1 Groundwater Screening Locations <br />Temporary piezometers will be installed at three (3) locations within the groundwater assessment <br />area using hollow stem auger (HSA) methods to enable further subsequent sampling. A <br />continuous soil sample will be collected prior to monitoring well installation and logged. <br />Selected horizon/lithologic units will be sampled and submitted to the agronomic laboratory, <br />ServiTech, for analysis of select soil agronomic test parameters) to evaluate the feasibility of the <br />' Soil agronomic parameters to be analyzed by ServiTech will include: nitrate -nitrogen, phosphorus, potassium, <br />sulfur, calcium, magnesium, sodium, zinc, iron, manganese, copper, organic matter, soil pH, buffer pH, soluble salts, <br />cation exchange capacity, base saturation percentage <br />NCP2020_3158/JL200925 2020 Compliance Monitoring Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.