My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2020
CBCC
>
Meetings
>
2020's
>
2020
>
09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:22:38 PM
Creation date
11/9/2020 11:49:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 20 <br />3Er40,'�R1?, JrJ1 , FLORIDA PUBLIC SERVICT'COi r%flSSION <br />Review of 2(%20-2629 Storm 'Protection Plan Docket No. 202000`70 -EC <br />pursuant to Rule 25-6.030, F; A.C., Gulf Power <br />Company <br />Review of 2026-2029 storm Protection Plain Dod et No. 20200071 -FI <br />pursuant to Rule 25--6 030, F.A.C., Florida <br />Po«ver & Light Company <br />In ren Ston n 'Protection Plan Cost Recovery Docket No. 20200092 -EI <br />Clause <br />Filed July 27; 2020 <br />STIPULATION AND SETTLEMENT. <br />Attachment A <br />WHEREAS, Gulf PoNver Company("Gulf .), Florida 'Power &; Light Company (."FPL"), <br />Citizens through the Office of Public Counsel ("()PC"), and Walmart ;Tic. ("WalmaW) have <br />Signed this Stipulation and Settlement .(the "Agreement"-, unless the :context clearly requires <br />otherwise, the Germ "Party,or "Parties" means. a signatory to,this Agreement)•,. <br />WHEREAS, On June 27, 2019 the ,Governor of Florida signed CS/C.$/CS/S13 796' <br />addressing Stornn Protection Plan Cost 'Recovery; which was codified in'section366.96; F. S: <br />WHEREAS,`"tlie Florida Legislature found in Section 366.96('1)(c), F.S,; that it was iri the <br />State's interest to "strengthen electric utility infrastructure to withstand extreme :weather <br />conditions "by promoting the overhead hardening of :electrical transmission and ;distribution <br />facilities, the undergrounnding of certain electrical distribution lines, and vegetation management;" <br />and for each electric utility to "mitigate.restoration costs and outage times to utility customers <br />cvlien developing transmiss..ioi.. and distribution storm protection plans," Section 366.96(1)(e), <br />F. S:; <br />1 <br />2--2-0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.