Laserfiche WebLink
TIME SCHEDULE <br />Consultant will include these additional services with the approved Work Order #1 and <br />anticipates an additional 8-12 weeks will be necessary to complete. <br />FEESCHEDULE <br />We will provide these services in accordance with our Agreement for Professional Services <br />for Water Plant and Water Resources Engineering Services — RFQ 2019070, dated <br />November 5, 2019, by and between INDIAN RIVER COUNTY, a -political subdivision of <br />the State of Florida ("COUNTY") and Kimley-Horn and Associates; Inc., ("Consultant"). <br />The Consultant will provide professional services for Task/1""through Task 4 on a lump <br />sum fee basis as follows: <br />Task <br />No. <br />Task <br />Work Order <br />1` <br />Amendment <br />1 <br />`,,,Updated <br />\Total� <br />Task 1 <br />Preliminary Design <br />$ 46,214 �, <br />, $ QjA <br />$ 46,714 <br />Task 2 <br />Prepare Documents <br />$491,644 <br />$'94 030. <br />$585 674 <br />Task 3 <br />Permitting.$ <br />11,206 <br />"$,26,928 <br />$ 37,234 <br />Task 4 <br />Bidding <br />`$ 119175 <br />$ 7,194, <br />$26,146 <br />Total Lump Sum Fee = <br />$\568,249 <br />$127;252 % <br />$695,501 <br />The following servic <br />be required dependir. <br />Additional services i <br />• Sit -e plate rining s not: <br />• construction phase, <br />as a separate work4 <br />• Permit application f(• New permit applicat <br />in theScope of Services for this project, but may <br />that m y arise during the execution of this project. <br />be limited to the following: <br />but can -be provided after bidding phase. <br />io-Oncluded under this task order, but will be prepared <br />>r uprating of the WTP <br />for DC disposal at Osprey Marsh <br />81 <br />