Laserfiche WebLink
Pafrick S. Walther, P.E. <br />September 20, 2016 <br />Page 3 of 5 <br />information to be included on the plans. McMahon will make every effort to design the traffic <br />signal to avoid any existing utilities. If utility relocation is necessary, the utility relocation <br />design and plans can be created under a supplemental work agreement. <br />B. Fiber Optic Network Plan - McMahon will coordinate with Indian River County to <br />determine the County's interconnect needs. If necessary, a Fiber Optic Network plan sheet <br />will be included in the plan set. <br />C. General Note Sheet — A general construction note sheet will be prepared, and will be <br />included with the plan set package. The general notes will include general construction <br />information, utility operation data, maintenance of traffic information, and reference to <br />standard or special construction details/notes as required by Indian River County. <br />D. Quantities Sheet — The quantities sheet will include a tabulation of items, description and <br />quantity of materials, and type of work for the location. Specific notes referencing pay items <br />or indicating special design information will also be indicated. <br />E. Mast Arm Detail Sheets — For purposes of this proposal, it is assumed that the mast arm <br />design will be in conformance with the FDOT Mast Arm Assemblies Indices. The Mast Arm <br />Detail sheets will include the tables showing the mast arm pole and arm designations, as well <br />as the signal and sign data for each mast arm structure. <br />F. Guidesign Detail Sheets — The Guidesign detail sheets will include information for the <br />internally illuminated street name signs that will be mounted on the mast arms. For purposes <br />of this proposal, it is assumed that two (2) different street name legend signs will be required. <br />G. Mast Arm Analysis — The mast arm will be designed and analyzed with Mathcad using the <br />FDOT Mast Arm data files. Any deviations from the FDOT standard mast arm criteria will <br />be detailed in the Special Drilled Shaft section of the Standard Mast Arm Assemblies Data <br />Table and \ or a Special Mast Arm Assemblies Data Table, if required. For the purposes of this <br />proposal, it is assumed that four (4) mast arms will be required. . <br />The services to be performed pursuant to this agreement are strictly limited to those expressly set forth <br />herein. <br />FEE <br />The lump sum fee for the above-mentioned services is $21,000.00, including expenses. If additional <br />services are required that exceed those identified in this Scope of Work, a supplemental agreement will <br />be submitted to the client for review and approval prior to the commencement of any additional tasks. <br />Additional services will commence upon written authorization to proceed by the client. <br />1S$ <br />