Laserfiche WebLink
BOOK 95 PA�-L 113 <br />omp rehensive Plan Requirements - <br />lant Capacity _ <br />Water and Sewer <br />Policy 5.3 - Design for additional capacity for <br />regional facilities shall begin when a facility is at <br />50% of its capacity,. and construction of additional <br />its <br />capacity shall begin when a facility is at <br />capacity in order to guarantee provision of more <br />than the minimum level of service. All future <br />expansions will be based on the committed and <br />projected future demand. <br />Department of Environmental Protection- <br />zpansion Requirements <br />When 3 month average daily flow for the most recent <br />three consecutive months exceeds 50% of the <br />permitted capacity of the treatment plant the <br />permittee shall submit to the Department a capacity <br />analysis report. If capacity report documents that the <br />permitted capacity will be equaled or exceeded within <br />the next three years, the permittee shall submit a <br />complete construction permit application to the <br />Department within 30 days of submittal of the <br />capacity analysis report. <br />Department of Utility Services <br />Investment in Plant to Achieve Goals <br />Water and Wastewater Plant $117 <br />$120 <br />$100 <br />$80 <br />$60 <br />$40 <br />$20 <br />$0 <br />MAY 189 1995 <br />M <br />1984 1989 1994 <br />4 <br />■$ M <br />M <br />