My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />1.1 SCOPE <br />A. Provide all construction equipment and facilities and temporary controls <br />required to satisfactorily complete the work represented on the Drawings and <br />described in the Specifications. <br />1.2 RESPONSIBILITY <br />A. All construction facilities and temporary controls remain the property of the <br />Contractor establishing them and shall be maintained in a safe and useful <br />condition until removed from the construction site. <br />B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, <br />sheeting, forms, barricades, drains, flumes, and the like, any of which may <br />be needed in construction of any part of the work and which are not herein <br />described or specified in detail, must be furnished, maintained and removed <br />by the CONTRACTOR, who is responsible for the safety and efficiency of <br />such work and for any damage that may result from their failure or from their <br />improper construction, maintenance or operation. <br />C. In accepting the Contract, the CONTRACTOR assumes full responsibility for <br />the sufficiency and safety of all hoists, cranes, temporary structures or work <br />and for any damage which may result from their failure or their improper <br />construction, maintenance or operation and will indemnify and save harmless <br />the OWNER and ENGINEER from all claims, suits or actions and damages <br />or costs of every description arising by reason of failure to comply with the <br />above provision. <br />1.3 TEMPORARY UTILITIES AND SERVICES <br />A. TEMPORARY WATER <br />1. Provide a temporary water service as required for all construction <br />purposes and pay for all water used. <br />2. Furnish potable drinking water in suitable dispensers and with cups <br />for use of all employees at the job. <br />3. Provide all temporary piping, hoses, etc., required to transport water <br />to the point of usage by all trades. <br />4. When temporary water service is no longer required, remove all <br />temporary water lines. <br />01520-1 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid DocumentsWlaster <br />Contract Documents\Master Contract Documents\01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.