My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />B. TEMPORARY SANITARY FACILITIES <br />1. Provide temporary toilet facilities separate from the job office. <br />Maintain these during the entire period of construction under this <br />Contract for the use of all construction personnel on the job. Provide <br />enough chemical toilets to conveniently serve the needs of all <br />personnel. Properly seclude toilet facilities from public observation. <br />2. Chemical toilets and their maintenance shall meet the requirements of <br />State and local health regulations and ordinances. Immediately <br />correct any facilities or maintenance methods failing to meet these <br />requirements. Upon completion of work, remove the facilities from the <br />premises. <br />1.4 SECURITY <br />Full time watchmen will not be specifically required as a part of the Contract, but the <br />CONTRACTOR shall provide inspection of work area daily and shall take whatever <br />measures are necessary to protect the safety of the public, workmen, and materials, <br />and provide for the security of the site, both day and night. <br />1.5 TEMPORARY CONTROLS <br />Take all necessary precautions to control dust and mud associated with the work of <br />this Contract. In dry weather, spray dusty areas daily with water in order to control <br />dust. Take necessary steps to prevent the tracking of mud onto adjacent streets <br />and highways. <br />1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />Remove the various temporary facilities, services, and controls and legally dispose <br />of them as soon as the work is complete. The areas of the site used for temporary <br />facilities shall be properly reconditioned and restored to a condition acceptable to <br />the OWNER. <br />+ + END OF SECTION + + <br />01520-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br />Contract Documents\Master Contract Documents\01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.