My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.1 GENERAL <br />A. CONTRACTOR shall be responsible for taking all precautions, providing all <br />programs, and taking all actions necessary to protect the Work and all public and <br />private property and facilities from damage as specified in the General Conditions <br />and herein. <br />B. In order to prevent damage, injury or loss, CONTRACTOR'S actions shall include, <br />but not be limited to, the following: <br />1. Store apparatus, materials, supplies, and equipment in an orderly, safe <br />manner that will not unduly interfere with the progress of the Work or the Work <br />of any other Contractor or utility service company. <br />2. Provide suitable storage facilities for all materials, which are subject to injury by <br />exposure to weather, theft, breakage, or otherwise. <br />3. Place upon the Work or any part thereof, only such loads as are consistent <br />with the safety of that portion of the Work. <br />4. Clean up frequently all refuse, rubbish, scrap materials, and debris caused by <br />construction operations, so that at all times, the site of the Work presents a <br />safe, orderly, and workmanlike appearance. <br />5. Provide barricades and guard rails around openings, for scaffolding, for <br />temporary stairs and ramps, around excavations, elevated walkways and other <br />hazardous areas. <br />C. Except after written consent from proper parties, do not enter or occupy <br />privately -owned land with men, tools, materials or equipment, except on easements <br />provided herein. <br />D. Assume full responsibility for the preservation of all public and private property or <br />facility on or adjacent to the site. If any direct or indirect damage is done by or on <br />account of any act, omission, neglect or misconduct in the execution of the Work by <br />the CONTRACTOR, it shall be restored by the CONTRACTOR, at its expense, to a <br />condition equal to or better than that existing before the damage was done. <br />1.2 BARRICADES AND WARNING SIGNALS <br />CONTRACTOR's responsibility for the maintenance of barricades, signs, lights, and for <br />providing watchmen shall continue until OWNER accepts the Project. <br />01541-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\13id Documents\Master <br />Contract Documents\IVlaster Contract Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.