My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />and that the roof does have structural slope. <br />2. A question was asked about responsibility for raising rooftop units. Mark Renninger responded <br />that since there is 4" of roof insulation existing, and 4" of roof insulation going back on the roof, <br />the rooftop units should not need to be raised. <br />3. A contractor asked about arranging a site visit to the project site (in addition to the site visit <br />scheduled following the Pre -Bid meeting). After a review by County Staff, One additional site visit <br />can be arranged. To arrange a site visit, a request must be made to the Purchasing Division no <br />later than 9AM Monday June 18, 2018. The additional site visit will be scheduled based on requests <br />received and will be noticed via addendum. <br />4. A question was asked regarding the condition of the rooftop units. Mark Renninger responded <br />that the condition is good, and generally consistent throughout the units. Mark added that there is <br />a future penetration included on the plans that the roofing contractor will need to flash in. <br />5. A contractor asked for clarification regarding the steel deck repair included in the plans/specs. <br />Mark Renninger explained that the steel deck repair is based on the level of corrosion found, if any. <br />6. A question was asked regarding the wood block nailers shown on the plans. Based on a review <br />of the project plans, the wood block nailers are to be replaced as part of the project. <br />Z A question was asked regarding additional submittals required for the City of Sebastian Building <br />Permit. Mark Renninger responded that the engineering for the project is complete, but the <br />contractor will need to submit Florida Product Approval documentation and a fastening plan based <br />on the specific products selected for the project. <br />With no further questions or comments, the meeting was ended at 10:23AM. A site visit followed to <br />the Sebastian Corners project site with several contractors in attendance. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.