My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />OTHER COORDINATION <br />City of Sebastian Building Department <br />North County Offices at Sebastian Corners (Project) <br />PROJECT CONSIDERATIONS <br />• Project Site Access: <br />o Contractor shall submit a roof access plan <br />o Contractor shall submit a public safety plan, including separation of work areas <br />from the general public, public parking areas, and public access points to the <br />existing tenant spaces <br />o Standard work hours <br />o Contractor must submit a request for proposed weekend or night work <br />• Staging and Material Storage <br />o Storage areas must be preapproved by county staff <br />o Portable restroom facilities <br />• Addendums <br />o Provide project related comments and questions ASAP. Response to comments <br />and questions received within 10 days of the bid opening date will not be <br />provided <br />• Subcontractors <br />o Per Contract Documents requirements "Section 00458 — List of Subcontractors" <br />DISCUSSION <br />Questions & Answers <br />Andy Sobczak, Indian River County Infrastructure Project Manager, began the meeting with <br />introductions, then provided a brief description of the Sebastian Corners Roof Replacement project <br />that included a technical description by Mark Renninger, REI Engineers, Inc, the County's roof design <br />consultant. During the project description, several contractors in attendance asked project related <br />questions. The questions and responses were as follows: <br />1. A contractor asked if the 4'screen wall is to be constructed by others. AndySobczak responded <br />no, the screen wall is to be constructed by the roofing contractor or subcontractor to the roofing <br />contractor. <br />2. A contractor asked of the details are available for the 4'screen wall. Mark Renninger responded <br />that the details are included in the project plans and specs. <br />Following the end of the project description, Andy Sobczak opened the meeting to discussion and <br />asked for any questions or comments. The following questions and comments were raised: <br />1. A contractor asked about the location of the screen wall and if the roof has structural slope. <br />Andy Sobczak responded that the screen wall is located along the back or west wall of the building <br />
The URL can be used to link to this page
Your browser does not support the video tag.