My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: INDIAN RIVER COUNTY <br />CONTRACTOR - <br />CONTRACT FOR: SEBASTIAN CORNERS ROOF REPLACEMENT. <br />Project No.: IRC -1765 <br />Project Description: REMOVAL AND REPLACEMENT OF EXISTING LOW SLOPE ROOF <br />SYSTEM AT INDIAN RIVER NORTH COUNTY OFFICES AT SEBASTIAN CORNERS WITH <br />A COMPLETE WATERTIGHT 20 -YEAR WARRANTABLE ASSEMBLY. <br />OWNER's Bid No: 2018062 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />T <br />And T <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 15 calendar <br />days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: <br />00630- Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />FAPublic WorWENGINEERING DIVISION PROJECTS\1765 Sebastian Comers Roof Replacement\l-Admin\Bid Documents\Master Contract DocumentsWaster <br />Contract Documents\00630 - Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.