Laserfiche WebLink
OWNER:- <br />CONTRACTOR:- <br />The <br />WNER:CONTRACTOR: <br />The following documents are attached to and made a part of this Certificate: <br />[For items to be attached see definition of Substantial Completion as supplemented and other specifically <br />noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents nor is it a release of CONTRACTOR's obligation to complete the Work in <br />accordance with the Contract Documents. <br />Executed by ENGINEER on: <br />ENGINEER: <br />By: <br />(Authorized Signature) <br />(Date). <br />CONTRACTOR accepts this Certificate of Substantial Completion on (date). <br />CONTRACTOR: <br />By: <br />(Authorized Signature) <br />OWNER accepts this Certificate of Substantial Completion on (date). <br />OWNER: INDIAN RIVER COUNTY <br />By: <br />(Authorized Signature) <br />* * END OF SECTION * * <br />00630 - Certificate of Substantial Completion REV 04-07 00630-2 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Comers Roof Replacement\1-Admin\Bid Documents\Master, Contract Documents\Master. <br />Contract Documents\00630 - Certificate of Substantial Completion REV 04-07.doc <br />