... [T]he tower is to be located a distance more than equal to three hundred (300) percent <br />of the tower height from the nearest residential dwelling (existing or under construction). <br />A distance of 1,500 feet (300% of the 500 foot tower height) measured from the base of the subject <br />tower covers the entire +17.8 acre property. As such, staff's finding is that development of a residential <br />dwelling on the same property (owned/controlled by the same owner of the nonconformity) would <br />increase the degree of the existing site -related nonconformity (the tower), since the 500' tower would <br />not be allowed within 1,500 feet of a residential dwelling if built under current LDRs. <br />Over the past year, Mr. Allenbaugh has researched the approval history and specifications of the subject <br />communications tower. Among other things, Mr. Allenbaugh has learned that the tower, when built, <br />was engineered to have a 200' design fall radius, a distance substantially less than the dwelling setback <br />requirement of 300% of the tower height (1,500' in this case). Also, he was advised by staff that off-site <br />residential dwellings, on parcels not under the ownership/control of the tower parcel owner, are allowed <br />within the 1,500 setback. <br />Appeal of Staffs Decision <br />Initially, Mr. Allenbaugh's appeal started as an appeal of staff's interpretation of County regulations, <br />contending that a residential dwelling should be allowed on the subject tower property, albeit outside of <br />the tower's 200' design fall radius, particularly since off-site dwellings on parcels not under the <br />ownership/control of the tower parcel owner are allowed within 1,500' of the tower. Mr. Allenbaugh <br />has also provided examples of Vertical Bridge towers at other locations (outside of Indian River County, <br />in Florida and in other states) where development has been allowed to occur in close proximity to <br />towers of similar design (see application, Attachment 4). <br />The procedure for processing "appeals from decisions of the community development director or his <br />designee" is established under County Code Section 902.07 (see Attachment 5), which indicates that the <br />Planning and Zoning Commission (PZC) hears and decides such appeals. <br />Consistent with that procedure, Mr. Allenbaugh requested a formal letter from staff (i.e., the community <br />development director or his designee) reaffirming staff's position on the matter. That letter was <br />provided to him on March 12, 2020 (see Attachment 6). Subsequently, on April 3, 2020, Mr. <br />Allenbaugh submitted an appeal of staff's March 12 letter, appealing staff's reaffirmed interpretation of <br />the development restrictions applying to the subject tower property. <br />Planning and Zoning Commission Decision <br />On July 23, 2020, the PZC made a finding that staff s determination did not fail any of the three areas <br />outlined in LDR Section 902.07(4), denied the appeal, and wholly affirm staff's determination by a vote <br />of 5-2 (see Attachment 2). While affirming staff s determination, several members of the PZC, in <br />acknowledgement of the unique set of facts regarding this situation, discussed the options for further <br />appeal. At that point, staff confirmed that applicant could further appeal the PZC's decision to the Board <br />of County Commissioners (BCC). <br />171 <br />