My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/22/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
09/22/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:31:45 PM
Creation date
1/22/2021 12:24:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/22/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Amendment 1 to Work Order Number 3 <br />Indian River County Department of Utility Services <br />South Oslo Rd Water Plant Floridan Well Deepening and Reha <br />Additional Construction Phase Services <br />PROJECT UNDERSTANDING <br />Indian River County Utilities (IRCU) awarded All Webbs Enterprises, Inc. (AWE) <br />construction of wells S-7 and S -4R, including deepening the borehole of wells' S-2, S-3, <br />S-5 and S-6 on July 16, 2016, and June 13, 2018. The work was originally intended to be <br />completed within 445 days on February 14, 2019. To date, it appears AWE may be <br />completed more than a year and a half over the originally approved schedule, orl <br />approximately 600 days. It should be noted that this project has been on-going for more <br />than 4 years. <br />Consultant has expended additional time overseeing drilling and construction <br />activities, resulting in additional effort beyond the work order #3. As result, the <br />following scope consists of additional oversight during drilling, and coordination to the <br />existing work order with IRCU. I <br />SCOPE OF WORK <br />Consultant will provide construction phase services including hydrogeological ser <br />performance testing of each well, and preparation of a supporting well completion <br />report for wells #S-2, S-3, S-5, and S-6 Floridan Aquifer wells. Consultant will utii <br />subconsultant services of JLA Geosciences, Inc. for the Hydrogeologic Consulting <br />Services (JLA). <br />Consultant will provide additional hydrogeological support and observation services <br />during Upper Floridan Aquifer well deepening, including pilot hole drilling and <br />reaming, geophysical logging, completion interval drilling and associated testing, <br />preliminary well development, acid treatment, pump development and testing, p st <br />rehabilitation development testing and specific capacity testing; and witness post - <br />rehabilitation videos. Consultant will provide an additional 80 hours of additional on- <br />site hydrogeological services (JLA) for well deepening. I <br />Consultant will coordinate additional water quality testing, which includes additi <br />water quality data for membrane projections. Consultant will provide additional <br />wellsite review pre- and post- deepening and rehabilitation since contractor must <br />remove the existing wellhead equipment to allow an alternate deepening rig on -s <br />
The URL can be used to link to this page
Your browser does not support the video tag.