Laserfiche WebLink
Consultant will attend meetings and make onsite site visits for each of the four (4) <br />existing wells to be deepened; provide coordination during construction, reviews of <br />individual well geophysical and video logging, review contractor's submittals inch <br />acid treatment plan, onsite hydrogeologic observation during critical elements of <br />deepening, well logging. <br />Consultant will attend additional pump startups, and well site visits to inspect i ork <br />completed to date. <br />It is anticipated that the additional construction phase that will be added will bel up to <br />560 calendar days beyond the approved schedule submitted by AWE. <br />Consultant will attend additional onsite progress meetings to discuss progress, <br />construction related issues, and provide coordination where needed. <br />SCHFDULF. <br />In general, the schedule will coincide with the Contractor's (AWE) additional <br />needed to complete the project and is assumed to be 365 additional days. <br />FEESCHEDULE <br />We will provide these services in accordance with the Continuing Consulting <br />Engineering Services Contract Agreement for Professional Services with Kimley. <br />and Associates dated April 17th, 2018. <br />The Consultant will provide professional services on a lump sum fee basis of <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, <br />be required depending on circumstances that may arise during the execution of <br />project. Additional services include, but may not be limited to the following: <br />• Mechanical Design of pumps or wellheads <br />• Preparation of wellfield operating plans <br />• Permitting support other than FDEP certification of completion <br />ITEMS FURNISHED BY OWNER <br />The following items will be furnished by the Owner and are necessary for com <br />the tasks described herein. <br />• None <br />Horn <br />t may <br />74 <br />of <br />