Laserfiche WebLink
December 3, 2020 <br />Mr. Eric Flavell, PE, F -ASCE <br />Bowman Consulting Group <br />4450 W. Eau Gallie Blvd., Suite 232 <br />Melbourne, FL 32934 <br />l <br />INFRASTRUCTURE <br />SOLUTION SERVICES <br />7175 Murrell'Road, 11v4elbourrfe, FL 32940 <br />('none: 321.622-4646 <br />Subject: Proposal to Provide Surveying Services <br />Project No. BWM003 - IRC 82nd/26th Utility Relocate Route Survey <br />Dear Mr. Flavel: <br />Infrastructure Solution Services (ISS) is pleased to provide this proposal for surveying services for the <br />Indian River County 82nd/26th Utility Relocate Route Survey (the "Project") in Vero, Florida, for <br />Bowman Consulting Group (BCG). <br />SECTION I. BACKGROUND <br />After speaking with Mr. Flavell (BCG and reviewing the provide_ d scope and limits, it is ISS's <br />understanding that the Project consists of a topographic route survey of approximately 4,300' of two- <br />lane rural roadway 1,100'of private dirt roadway and 300' of large drainage ditch topography. The <br />Project includes approximately 2,300' of 82nd Street, 2000' of 26th Street, 1,100,of private access road <br />that runs adjacent to 82nd Avenue and approximately 300' of drainage ditch topography west of the <br />intersection of 82nd and 26th to be used as basis of design for the relocation of utilities owned by <br />Indian River County. It is our understanding that the Project will include establishing all right of way <br />(ROW) lines and approximate lot lines per plat and property appraiser information to be utilized for the <br />purpose of designing the relocations. <br />ISS will establish a minimum of five (5) site benchmarks within the project area. The ISS project team <br />will locate all visible aboveground improvements, locate lines of dense vegetation, perform cross <br />sections at no greater than 100' intervals to establish the project topography. Cross sections of lesser <br />intervals will be performed if the terrain, dictates and all grade breaks will be collected. ISS will locate all <br />traffic pavement markings within the Project area. The location of any underground utilities that will be <br />marked by Blood Hound Utility Group will be located when all markings are completed and ISS is <br />provided a sketch of all markings to ensure that the locates are thorough. Mr. Flavell (BCG) has <br />requested a high-resolution georeferenced drone image to be used as a background in the survey. <br />f` <br />