My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-020
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:35:26 AM
Creation date
2/11/2021 11:35:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2021
Control Number
CCN2018
Agenda Item Number
8.I.
Entity Name
Bowman Consulting Group, Ltd
Subject
CNNA2018 Work Order 4 FDOT Project 230879-3-52-01
Area
82nd Avenue at 26th Street Utilities Relocation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L3o,onnanCon;ultut Group <br />`lI . Erir Flavell, Nl(, r ASCE <br />Uer.etnher 3, 202(1 <br />SECTION II.. SCOPE OF SERVICES <br />TASK 1- Topographic Survey (As defined in Chapter 5J-17 Administrative Code) <br />A. Using the nearest published horizontal and vertical control, ISS will establish a minimum of five (5) <br />site control points with NAD 1983 State Plane coordinate values and NAVD 88 vertical values for <br />the collection of data and to be used as site benchmarks. <br />B. Establish all of the of the ROW lines, easement lines and approximate lot lines within the project <br />area. <br />C. Map all above ground existing conditions utilizing conventional survey and GPS real-time kinematic <br />(RTK) methods along the route. Collect any marked underground utilities marked by Blood Hound <br />Utility Group. <br />D. Fly a predefined route in accordance with all FAA part 107 regulations with a DJI Phantom 4 Pro <br />drone to obtain aerial images. Aerial images will be processed via Pix4D photogrammetry software <br />for image only. <br />SECTION 1II. SUBCONSULTANTS <br />To be determined for septic tank locations. <br />SECTION IV. CLIENT'S RESPONSIBILITY <br />The following will be the responsibility of BCG to provide to the ISS project team: <br />A. Access to the project site and upfront communication with homeowners <br />B. Identification and marking of underground utilities <br />SECTION, V. DELIVERABLES <br />ISS will provide the following deliverables: <br />Task 1- Existing Conditions Map <br />Three (3) copies of signed and sealed survey maps and one (1) digital copy delivered on CD or USB <br />drive. <br />SECTION VI. SCHEDULE <br />ISS will begin survey field work for each task within two (2) weeks of receiving the signed proposal from <br />BCG. Field work and drafting will be complete within four (4) weeks of Project commencement. Survey <br />map deliverables will be provided to BCG within five (5) days thereafter. <br />6 <br />r <br />f <br />f <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.