Laserfiche WebLink
L3o,onnanCon;ultut Group <br />`lI . Erir Flavell, Nl(, r ASCE <br />Uer.etnher 3, 202(1 <br />SECTION II.. SCOPE OF SERVICES <br />TASK 1- Topographic Survey (As defined in Chapter 5J-17 Administrative Code) <br />A. Using the nearest published horizontal and vertical control, ISS will establish a minimum of five (5) <br />site control points with NAD 1983 State Plane coordinate values and NAVD 88 vertical values for <br />the collection of data and to be used as site benchmarks. <br />B. Establish all of the of the ROW lines, easement lines and approximate lot lines within the project <br />area. <br />C. Map all above ground existing conditions utilizing conventional survey and GPS real-time kinematic <br />(RTK) methods along the route. Collect any marked underground utilities marked by Blood Hound <br />Utility Group. <br />D. Fly a predefined route in accordance with all FAA part 107 regulations with a DJI Phantom 4 Pro <br />drone to obtain aerial images. Aerial images will be processed via Pix4D photogrammetry software <br />for image only. <br />SECTION 1II. SUBCONSULTANTS <br />To be determined for septic tank locations. <br />SECTION IV. CLIENT'S RESPONSIBILITY <br />The following will be the responsibility of BCG to provide to the ISS project team: <br />A. Access to the project site and upfront communication with homeowners <br />B. Identification and marking of underground utilities <br />SECTION, V. DELIVERABLES <br />ISS will provide the following deliverables: <br />Task 1- Existing Conditions Map <br />Three (3) copies of signed and sealed survey maps and one (1) digital copy delivered on CD or USB <br />drive. <br />SECTION VI. SCHEDULE <br />ISS will begin survey field work for each task within two (2) weeks of receiving the signed proposal from <br />BCG. Field work and drafting will be complete within four (4) weeks of Project commencement. Survey <br />map deliverables will be provided to BCG within five (5) days thereafter. <br />6 <br />r <br />f <br />f <br />t <br />