My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-021
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:45:40 AM
Creation date
2/11/2021 11:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2021
Control Number
2021-021
Agenda Item Number
12.H.1.
Entity Name
Bowman Consulting Group, Ltd
Subject
West Wabasso Septic to Sewer Phase III, CCNA2018 Work Order No. 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A -SCOPE OF WORK <br />Bowman Consulting Group Ltd. is pleased to submit this proposal for professional engineering services <br />to Indian River County Utility Department for engineering services to design and permit a septic to <br />sewer project located in West Wabasso. <br />PROJECT BACKGROUND & UNDERSTANDING <br />We had several discussions with Mr. John Boyer to discuss the West Wabasso septic to sewer project <br />and the work is summarized below: <br />The project consists of two sites that together are identified as Phase 3. Phase 3A consists of 61St <br />Drive from CR 510 to the end of the road. The work would include a gravity collection system and lift <br />station design and there is no expansion potential anticipated for this location. The County has <br />provided survey and a preliminary design that can be used by consultants. Phase 3B consists of 591h <br />Avenue and 58th Court from CR 510 to the end of the road. The work would include a gravity collection <br />system and lift station and there is expansion potential to the south of the project down to the canal <br />crossing with 58th Avenue. No previous work has been performed on this site. <br />County will provide topo mapping and site survey, including clean outs, septic tank(s) and drain field(s) <br />for each dwelling for the 61 It Drive Site (Phase 3A) for consultants to use for the design of proposed <br />improvements. Consultants will provide topo mapping and site survey, including location clean outs, <br />septic tank(s) and drain field(s) for each existing dwelling for the 59th Drive and 58th Court Site (Phase <br />3B) for the limits of the waterline loop and nothing to the south of the waterline. <br />The work for both sites will be included in one set of drawings. One bid schedule will be prepared that <br />will tabulate each site separately with one total. Specifications prepared by consultant will consist of bid <br />schedule, bid descriptions, and technical specifications. County will provide front end documents <br />including general provisions. The design is anticipated to include the connection to each dwelling and <br />abandonment of existing located septic tanks. The design will include gravity sewer and lift station. <br />The lift station for the 61St Drive Site (Phase 3A) will be designed for the current number of existing <br />dwellings and for build out of the existing lots only. The lift station for the 59th Drive and 58th Court Site <br />(Phase 3B) will be designed for the current number of existing dwellings and build out of all lots <br />including those south to the junction of the canal with 58th Avenue. Those two conditions will be <br />calculated so the County will know what changes to the lift stations will be required full build out. <br />All roads will be designed for reconstruction (pavement, base and subbase or equivalent) after the <br />construction of sewer in 61St Drive, 59th Avenue, 58th Court. <br />Permitting is anticipated to include FDEP for the gravity sewer and lift stations and IRC right of way <br />permits for 61St Drive, 59th Avenue, 58th Court and crossing 58t' Avenue. We will also need to obtain a <br />"No permit Required" determination from SJRWMD for the proposed road. work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.