My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-021
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:45:40 AM
Creation date
2/11/2021 11:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/02/2021
Control Number
2021-021
Agenda Item Number
12.H.1.
Entity Name
Bowman Consulting Group, Ltd
Subject
West Wabasso Septic to Sewer Phase III, CCNA2018 Work Order No. 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />We propose to provide the following services: <br />Task 1 - Civil Design Services (Bowman Consulting) <br />System Evaluation and Design <br />1. Prepare report that includes evaluation and determination of gravity sewer build out <br />control grades for each site. Estimate current wastewater flows and build out <br />wastewater flows for each site. Summarize lift station components that will be required <br />to change between current design and build out for each site. <br />2. Utility Research: contact utility companies and obtain record information and transfer <br />information to design drawings. <br />Prepare Bidding Documents <br />3. Attend and prepare summary meeting notes for up to two (2) meetings, anticipated to be <br />at beginning, and 50% complete milestones of the project. <br />4. Prepare 24" x 36" drawings anticipated to be: <br />Sheet <br />Description <br />G-1 thru 2 <br />Cover Sheet, Construction Notes Sheet <br />D-1 thru 3 <br />Details Site, sewer, road and drainage) <br />SP -1 thru 6 <br />SWPPP Sheets both sites <br />PA -1 thru 8 <br />Phase 3A Site: 1 - Overall Site Plan, 4 - 30 scale Plan & Profile, 3- LS. <br />Plan, Sections and Details <br />PB -1 thru 10 <br />Phase 313 Site: 1 - Overall Site Plan, 6 - 30 scale Plan & Profile, 3- L.S. <br />Plan, Sections and Details <br />5. Coordinate with FPL for service and service voltage available. <br />6. Multiple site visits and coordination with the residents for identification of design issues. <br />7. Utilize the IRCDUS Utility Construction Standards and supplement with specifications as <br />necessary for the design. <br />8. Provide two (2) engineer's opinion of estimated construction cost and design plans at <br />50% and after 90% design milestone. Final estimate will match bid schedule. <br />9. Field review design/plans at 90% complete milestone to compare with site conditions. <br />In-house plan checking and respond to Utility comments and prepare final drawings and <br />specifications. <br />Task 2 - Permitting Services (Bowman Consulting) <br />Project Permitting <br />14. Prepare and submit FDEP permit the project (both Phases), including fees of $250. <br />Respond to comments and follow through to final clearance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.