Laserfiche WebLink
SCOPE OF SERVICES <br />We propose to provide the following services: <br />Task 1 - Civil Design Services (Bowman Consulting) <br />System Evaluation and Design <br />1. Prepare report that includes evaluation and determination of gravity sewer build out <br />control grades for each site. Estimate current wastewater flows and build out <br />wastewater flows for each site. Summarize lift station components that will be required <br />to change between current design and build out for each site. <br />2. Utility Research: contact utility companies and obtain record information and transfer <br />information to design drawings. <br />Prepare Bidding Documents <br />3. Attend and prepare summary meeting notes for up to two (2) meetings, anticipated to be <br />at beginning, and 50% complete milestones of the project. <br />4. Prepare 24" x 36" drawings anticipated to be: <br />Sheet <br />Description <br />G-1 thru 2 <br />Cover Sheet, Construction Notes Sheet <br />D-1 thru 3 <br />Details Site, sewer, road and drainage) <br />SP -1 thru 6 <br />SWPPP Sheets both sites <br />PA -1 thru 8 <br />Phase 3A Site: 1 - Overall Site Plan, 4 - 30 scale Plan & Profile, 3- LS. <br />Plan, Sections and Details <br />PB -1 thru 10 <br />Phase 313 Site: 1 - Overall Site Plan, 6 - 30 scale Plan & Profile, 3- L.S. <br />Plan, Sections and Details <br />5. Coordinate with FPL for service and service voltage available. <br />6. Multiple site visits and coordination with the residents for identification of design issues. <br />7. Utilize the IRCDUS Utility Construction Standards and supplement with specifications as <br />necessary for the design. <br />8. Provide two (2) engineer's opinion of estimated construction cost and design plans at <br />50% and after 90% design milestone. Final estimate will match bid schedule. <br />9. Field review design/plans at 90% complete milestone to compare with site conditions. <br />In-house plan checking and respond to Utility comments and prepare final drawings and <br />specifications. <br />Task 2 - Permitting Services (Bowman Consulting) <br />Project Permitting <br />14. Prepare and submit FDEP permit the project (both Phases), including fees of $250. <br />Respond to comments and follow through to final clearance. <br />