My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-022
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 11:52:40 AM
Creation date
2/11/2021 11:52:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/02/2021
Control Number
2020-022
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
CCNA2018 Amendment 1 to Work Order 10, July 2018-December 2020 Technical Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />19 January 2021 <br />Page 2 <br />The Class I landfill currently accepts both Class I waste and C&D debris for disposal under the <br />Florida Department of Environmental Protection (FDEP) Construct and Operate Permit <br />Modification Nos. 0128769 -026 -SC -IM and 0128769 -027 -SO -MM, dated April 2, 2018 (Class I <br />Permit). The C&D debris disposal facility operates under FDEP Permit No. 0128769 -025 -SO - <br />24, dated July 13, 2017 (C&D Permit). <br />The Water Quality Monitoring Plan (WQMP) for each of the IRCL facilities permits (which is <br />listed as Appendix 3 of each permit) requires the preparation and submittal of a Technical Report <br />to FDEP every two and one-half years during the active life of the facility, and every five years <br />during the long-term care period. The report shall summarize the water quality monitoring <br />results and water level measurements collected since the last Technical Report. The last <br />Technical Report for both facilities was submitted to FDEP on 31 July 2018 for the reporting <br />period July 2015 through January 2018. The next Technical Report for the reporting period July <br />2018 through December 2020 is due for submittal to FDEP by 31 January 2021 and is the focus <br />of this proposal. <br />PROPOSED SCOPE OF WORK <br />The proposed scope of services includes activities to be performed on behalf of SWDD for the <br />preparation and submittal of the July 2018 to December 2020 Technical Report for the Class I <br />landfill and C&D debris disposal facility. For budgeting purposes, the scope of work will be <br />performed in two (2) phases, as follows: <br />Phase 1: General Consulting/Meeting Support/Project Management <br />Phase 2: Preparation of July 2018 - December 2020 Technical Report <br />Each of these phases is briefly described below. <br />Phase 1— General Consulting/ Meeting Support/ Project Management <br />Under this phase, Geosyntec will perform project planning and management responsibilities, <br />such as correspondence with SWDD and FDEP, invoice review, project coordination, and <br />project administration. Project management activities will include budget and schedule tracking, <br />invoice review, and project communications, including the preparation of a monthly progress <br />report. The project report will include a description of the activities completed during the month <br />and planned activities for the following month. In addition, the progress report will identify any <br />technical or administrative issues that require SWDD's attention and the current status of the <br />budget and schedule. <br />NCP2021 3028/JL21002 IRC LF Technical Reoort.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.