which items remain to be performed from the initial checklist and to supplement <br />that list as necessary and for the purpose of developing a joint single final punch list. <br />CONSULTANT will perform a final walk-through to determine if the all of the work <br />has been completed in accordance with the final punch list and Contract Documents. <br />CONSULTANT reserves the right to request additional compensation should <br />additional walkthroughs be required. <br />Subtask 7.8 CONSULTANT will assist the SWDD with project related correspondence to <br />CONTRACTOR, regulatory agencies, and other parties; provide monthly project <br />status reports; prepare monthly progress meeting minutes; and maintain <br />comprehensive project records and documentation on file. CONSULTANT will <br />maintain document log and documentation during the project. <br />Subtask 7.9 CONSULTANT will monitor/check performance tests and review field test reports <br />for conformance with project contract documents. <br />The level of work estimated for this project is based on a 210 -calendar day (147 working days) <br />construction period from the Notice to Proceed to Final Completion. CONSULTANT reserves the <br />right to request additional compensation, should Final Completion of construction extend beyond <br />the 210 -calendar day (147 working days) period. <br />TASK 8.0 - SPECIAL ENGINEERING SERVICES DURING CONSTRUCTION <br />Activities performed under this task consist of supplementary and special engineering services <br />required during the construction and implementation of the project: <br />Subtask 8.1 Prepare for SWDD a set of reproducible record drawings, digital copy in AutoCAD <br />and two Record Drawing prints showing those significant changes made during the <br />construction process based on information furnished to CONSULTANT by the <br />Contractor. <br />Subtask 8.2 Provide services in connection with preparing work change directives, change <br />orders to reflect changes to the construction project. A maximum of two change <br />orders are budgeted incorporating an estimated three items per change order. <br />Subtask 8.3 Provide services in connection with preparing final certifications of completion of <br />construction to the regulatory agencies. Final certification document is required to <br />close the permits for the landfill gas system expansion to FDEP. <br />TASK 9.0 - REPRESENTATIVE SERVICES DURING CONSTRUCTION <br />The activities performed under this task consist of providing resident project representative (RPR), <br />which will be conducted by CONSULTANT personnel during the construction and implementation <br />of the project: <br />Subtask 9.1 Activities performed under this task consist of furnishing a part-time RPR during <br />the project construction period of 210 calendar days (147 working days) when the <br />CONTRACTOR is on site performing work. We estimate the on on-site activities will <br />take 80 working days of the 147 working days period from Notice to Proceed to <br />Final Completion to observe the performance of the work of the contractor. <br />smith A-3 jj2943_IRC LFG EXP Exhibit <br />