Laserfiche WebLink
Subtask 9.2 The RPR as CONSULTANT's agent will act as directed by and under the supervision <br />of the CONSULTANT, and will confer with CONSULTANT regarding his actions. The <br />RPR's dealings in matters regarding the on-site work shall in general be only with <br />CONSULTANT and the Contractor, and dealings with subcontractors shall only be <br />through or with the full knowledge of the Contractor. Written communication with <br />SWDD will be only through or as directed by CONSULTANT. <br />Subtask 9.3 The RPR will prepare daily reports, describing the general working conditions, <br />areas of construction activity, tests performed and special and document unusual <br />events. <br />CONSULTANT will provide the RPR for observation of the work performed by the contractor, direct <br />and supervise the RPR, prepare supporting documentation in dealings with the contractor, and . <br />manage the documentation, daily reports, and test reports. Consultant will supply a recording rain <br />gage to be used for official rain monitoring for the project at the site of the work. The rain gage will <br />be turned over to SWDD once the project is completed. <br />The level of work estimated for RPR labor under this task is 320 labor -hours (80 working days <br />averaging 4 hours per day) and 44 labor -hours of CONSULTANT staff support for project <br />representative time. CONSULTANT reserves the right to request additional compensation, should <br />construction extend beyond the 320 labor-hour,period for the RPR and 44 labor -hour period for <br />CONSULTANT staff support for all of Task 9. <br />ASSUMPTIONS <br />• SWDD will be responsible for all permit application fees. <br />• An independent Quality Control laboratory is to be retained by the Contractor. <br />• Contractor will be responsible for reimbursing CONSULTANT for all overtime incurred <br />by CONSULTANT for work performed outside normal working hours, which are defined <br />as Monday through Friday, 7:00 am to S:00 pmin accordance with the Contract <br />Documents. <br />• This Scope of Services does not include a National Pollutant Discharge Elimination <br />System (NPDES) Notice of Intent, a St. Johns River Water Management District <br />Dewatering Permit, or any construction/building permits, which shall be obtained by <br />the Contractor constructing the project, if required. <br />• CONSULTANT reserves the right to seek additional compensation for work performed <br />beyond the described in this Scope of Services. <br />• CONSULTANT reserves the right to request additional compensation, should Final <br />Completion of construction extend beyond 210 -days (147 working days) after Notice to <br />Proceed or field services extend beyond the hours estimated above. <br />TASK 10.0 - ADDITIONAL ENGINEERING SERVICES DURING CONSTUCTION (CONTINGENCY) <br />At the request of the SWDD, CONSULTANT will perform additional engineering services for work <br />expressly excluded from this Work Order as noted in the assumptions above or requested by the <br />SWDD during the project. Additional Engineering Service may include but not be limited to any <br />other extended/additional engineering services or exceeding durations assumed above. A not -to - <br />exceed amount of $10,000 is established for services related to this task. <br />smith A-4 jj2943_IRC LFG EXP Exhibit A <br />