My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-026
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 11:05:08 AM
Creation date
3/1/2021 1:35:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/16/2021
Control Number
2021-026
Agenda Item Number
8.F.
Entity Name
Aptim Environmental & Infrastructure, Inc.
2021 Environmental Monitoring
Subject
Sector 3 Beach & Dune Restoration Project Conduct the 2021 Nearshor Hardbottom Biological
Monitoring. Conduct 2021 Post-Construction Sea Turtle Monitoring Work Order No. 2018006-9
Project Number
IRC-1925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 5, 2021 <br />Quintin Bergman, M.S. <br />Sea Turtle Environmental Specialist <br />Indian River County Public Works Coastal Division <br />1801 27th Street, Vero Beach, FL 32960 <br />Subject: Indian River County, FL <br />Sector 3 — 2018006 — Work Order #9 <br />2021 Environmental Monitoring <br />Dear Quintin: <br />EXHIBIT 1 Aptim Environmental & Infrastructure, Inc. <br />6401 Congress Avenue, Suite 140 <br />Boca Raton, FL 33487 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, LLC (APTIM), to provide <br />professional services to Indian River County (the County) in support of the Sector 3 Beach and Dune <br />Renourishment Project. The scope of work described herein is to support the County with the following items: <br />1. To conduct the 2021 Nearshore Hardbottom Biological Monitoring <br />2. To conduct the 2021 Post -Construction Sea Turtle Monitoring <br />The tasks to perform this work are listed below and described on the following pages. A breakdown of the hours <br />and expenses to develop the cost is attached. The scope and fee were developed following the provisions of the <br />Professional Services Agreement between Indian River County and APTIM, dated January 9, 2018, to provide <br />engineering and biological support services'for the Sector 3 (Wabasso Beach) Beach and Dune Renourishment <br />Project (RFQ#2018006). <br />1. Task 1: Pre -Construction Nearshore Hardbottom Biological Monitoring <br />The Sector 3 2021 nearshore hardbottom biological monitoring will be managed and conducted by APTIM, and <br />conducted by APTIM's approved subconsultant, Coastal Engineering Protection LLC (CPE). <br />The Biological Monitoring Plan developed for the Sector 3 project during permitting will require pre- and post - <br />construction biological monitoring adjacent to the project area to monitor for potential secondary impacts to <br />nearshore natural hardbottom. The scope for this task is based on the FDEP-approved Biological Monitoring Plan <br />(0285993 -009 -JC). The nearshore hardbottom monitoring shall include: <br />• Hardbottom edge mapping <br />• Monitoring permanent transects <br />Task 1: Scope of Work <br />1) Hardbottom Edge Mapping: <br />APTIM shall map the position of the nearshore hardbottom edge forthe entire Sector 3 project area, including <br />1000 feet north (updrift) and 3000 feet south (downdrift) of the project area (R-19 to R-58) for a length of <br />approximately 7.3 miles. A buoy with a Differential Global Positioning System (DGPS) antenna linked to a <br />
The URL can be used to link to this page
Your browser does not support the video tag.