Laserfiche WebLink
APTIM February 5, 2021 <br />Page 2 of 5 <br />topside laptop computer running HYPACK navigational software will be towed by divers to record the position <br />of the nearshore hardbottom edge. The divers will follow the inshore contour of the most prominent <br />hardbottom-sand interface. The purpose of the survey is to provide a baseline for comparison with post - <br />construction hardbottom edge delineations. <br />2) Installing and Monitoring Permanent Transects: <br />Thirty (38) permanent transects will be established along the length of project influence, which includes 1000 <br />feet north (updrift) and 3000 feet south (downdrift). This includes twenty-four (24) biological monitoring <br />transects and fourteen (14) sediment -only transects. All transects will run perpendicular to the shoreline and <br />extend from the landward hardbottom edge to a distance of 50 meters seaward. Stainless steel rods will be <br />used to permanently mark the transects to facilitate repeatability for post -construction monitoring. <br />Following transect establishment, a biological survey will be conducted to document the pre -construction <br />condition of the hardbottom using the following methods: <br />1) Quadrat Assessments: Up to nine (9) 0.5-m2 quadrats sampled along each transect to quantify the <br />benthic community. <br />2) Sediment Measurements: Collected using line -intercept and 1-m interval sediment depth <br />measurements. <br />3) Video/Photo Documentation: Collected for the length of each transect. <br />It is anticipated that up to 20 days of field operations is required to delineate the hardbottom edge, install <br />permanent transects and monitor the transects. The collected pre -construction data will be compiled and <br />incorporated into an interactive GIS database and the quadrat data will be entered into an Access database. <br />Data entry, reduction, archiving, and analysis time is included in the cost estimate to address the data <br />management and reporting requirements for the field operations. <br />Task 1: Deliverable <br />Raw data will be provided to FDEP and the County including a PDF of the scanned datasheets, excel spreadsheets <br />with quadrat data, interval sediment depth measurements and line -intercept data, shapefiles of the hardbottom <br />edge survey, video/photo documentation. Additionally, APTIM will provide a map of the project area and adjacent <br />hardbottom resources with the hardbottom edge delineation and monitoring transects overlaid onto the most <br />recent aerial photography (in digital format). A report is not proposed for the pre -construction monitoring survey. <br />APTIM will also provide information or assistance to County staff, as needed or requested. <br />Task 1: Schedule <br />The pre -construction monitoring event will take place during the summer (May —September) prior to project <br />construction. Raw data from field operations will be submitted to the County and FDEP within 45 days of <br />completion of the survey. <br />Task 1: Cost <br />The lump sum cost for this task is $183,539.43. <br />