My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-022A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-022A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 3:23:06 PM
Creation date
3/16/2021 3:20:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/09/2021
Control Number
2021-022A
Agenda Item Number
8.D.
Entity Name
PRP Construction Group, LLC
Subject
Kroegel Homestead Improvements
Area
11296 S. Indian River Dr., Sebastian.
Bid Number
2021007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum 2 - 2021007 Bid Form <br />ROADWORK/WALKWAYS ASPHALT MILLINGS .` <br />1 EM, DESCRIPTION UNIT;PRICE .t UNIT :C+,UANTITY" TOTAL <br />16 <br />3" Coquina Base (walking trail) <br />$ <br />9.00 <br />SY <br />373 <br />$ <br />3,357.00 <br />17 <br />6" Stabilized Subgrade (walking trail & concrete areas) <br />$ <br />4-50 <br />SY <br />690 <br />$ <br />3,105.00 <br />18 <br />4" Asphalt Millings (parking lot) <br />$ <br />21 no <br />SY <br />1224 <br />$ <br />25,704.00 <br />19 <br />8" Stabilized Subgrade (parking lot) <br />$ <br />6.00 <br />SY <br />1320 <br />$ <br />7,920.00 <br />20 <br />6" Thick Unreinforced Concrete <br />$ <br />48.50 <br />SY <br />300 <br />$ <br />14,550.00 <br />21 <br />6" Thick Concrete Sidewalk (REPLACEMENT) <br />$ <br />48.50 <br />SY <br />7 <br />$ <br />339.50 <br />22 <br />Pre -Cast Concrete Wheel Stop <br />$ <br />21.50 <br />EA <br />13 <br />$ <br />279.50 <br />23 <br />Parking Lot Gates <br />$ <br />1,845.00 <br />EA <br />2 <br />$ <br />3,690.00 <br />24 <br />Signage and Striping <br />$ <br />9,250.00 <br />LS <br />1 <br />$ <br />9,250.00 <br />Subtotal — Roadwork/Walkways <br />$ <br />68,195.00 <br />L5 1L' A 1t$-- tKt r 17 Lr o -F _? `F,JJV.VV <br />26 Mitered End Section $ 975.00 EA 4 $ 3,900.00 <br />Subtotal - Drainage $ 8,436.00 <br />27 Relocate Water Service Box & Line <br />$ <br />1,869.00 LS 1 <br />$ <br />1,869.00 <br />28 1.5" PVC Water Main <br />$ <br />20.50 LF 207 <br />$ <br />4,243.50 <br />29 6"4.5" T.S.&V <br />$ <br />1,137.00 EA 1 <br />$ <br />1,137.00 <br />30 1" Meter & RPz <br />$ <br />1,779.00 EA 1 <br />$ <br />1,779.00 <br />EA <br />Subtotal — Potable Water and Fire <br />$ <br />9,028.50 <br />34 <br />10" X 4" Tapping Sleeve and Valve (T.S. &V) <br />$ <br />3,997.00 <br />EA <br />31 <br />2" PVC Force Main <br />$ <br />21.50 <br />LF <br />180 <br />$ <br />3,870.00 <br />32 <br />4" Gate Valve <br />$ <br />945.00 <br />EA <br />1 <br />$ <br />945.00 <br />33 <br />4" X 2" MJ Reducer <br />$ <br />438.00 <br />EA <br />1 <br />$ <br />438.00 <br />34 <br />10" X 4" Tapping Sleeve and Valve (T.S. &V) <br />$ <br />3,997.00 <br />EA <br />1 <br />$ <br />3,997.00 <br />35 <br />4" PE Directional Bore <br />$ <br />110.00 <br />LF <br />80 <br />$ <br />8,800.00 <br />Subtotal - Sewer <br />$ <br />18,050.00 <br />Page 14 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.