Laserfiche WebLink
Addendum 2 - 2021007 Bid Form <br />Miscellaneous <br />ITEM DESCRIPTION UNIT PRICE`.: UNIT QUANTITY.TOTAL <br />36 15'x 15' Pavillion $ 18,394.50 LS 1 $ 18,394.50 <br />37 Landscaping $ 23,880.00 LS 1 $ 23,880.00 <br />Subtotal — Construction Services $ 42,274.50 <br />;CONSTRUCTION SERVICES <br />ITEM DESCRIPTION UNIT PRICE.-"-,, UNIT QUANTITY -..TOTAL <br />38 Survey Stake Out $ 8,650.00 LS 1 $ 8,650.00 <br />39 Asbuilts $ 5-1423.00 LS 1 $ 5,423.00 <br />Subtotal - Construction Services $ 14,073.00 <br />Total Project Cost (in words): Two Hundred Thirty Four Thousand, Four Hundred Forty Four Dollars and 50 cents <br />Alternate #1: <br />ROADWORK/WALKWAYS Alternate #1- COQUINA SURFACE <br />ITEM, DESCRIPTION UNIT PRICE ` UNIT QUANTITY._TOTAL: <br />16 <br />3" <br />Coquina Base (walking trail) . <br />$ <br />9.00 <br />Sy <br />373 <br />$ <br />3,357.00 <br />17 <br />6" <br />Stabilized Subgrade (walking trail & concrete areas) <br />$ <br />4.50 <br />Sy <br />690 <br />$ <br />3,105.00 <br />18 <br />6" <br />Coquina Base (parking lot) <br />$ <br />16.00 <br />Sy <br />1224 <br />$ <br />19,584.00 <br />19 <br />8" <br />Stabilized Subgrade (parking lot) <br />$ <br />6.00 <br />Sy <br />1320 <br />$ <br />7,920.00 <br />20 <br />6" <br />Thick Unreinforced Concrete <br />$ <br />48.50 <br />Sy <br />300 <br />$ <br />14,550.00 <br />21 6" Thick Concrete Sidewalk (REPLACEMENT) $ <br />48.50 EA 7 <br />$ 339.50 <br />22 Pre -Cast Concrete Wheel Stop $ <br />21.50 EA 13 <br />$ 279.50 <br />23 Parking Lot Gates $ <br />1,845.00 EA 2 <br />$ 3,690.00 <br />24 Signage and Striping $ <br />9,250.00 LS 1 <br />$ 9,250.00 <br />Subtotal — Alternate #1— Roadwork/Walkways <br />$ 62,075.00 <br />Page 15 of 38 <br />