Laserfiche WebLink
Attachment B <br />Page 13 of 27 <br />Photographs shall be taken the day prior to the start of construction and continue <br />as needed throughout the project. Photographs shall be taken the days of <br />Substantial Completion and Final Acceptance. <br />9.6 Geotechnical Engineering: <br />The prime Consultant may engage the services of a geotechnical subconsultant to perform <br />some of the services indicated in this section. However, the prime Consultant will be <br />responsible to Indian River County for the satisfactory performance and timeliness of these <br />services. <br />The prime Consultant will be required to interact with the District Geotechnical Engineer <br />(DGE) office and any geotechnical subconsultant assigned to the project by the DGE office <br />under a District -wide contract. All references to the DGE in the following sections <br />implicitly include the DGE and his/her delegated representative on the project, who may <br />be the DGE office in-house personnel or a subconsultant working for the DGE office. <br />Become familiar with the existing site conditions and the contract documents. Observe <br />and record the progress and quality of foundation work to determine that the foundations <br />are constructed at the correct locations and elevations, identify discrepancies, and direct <br />the Contractor to correct such observed discrepancies. Attend the Preconstruction <br />Conference and/or special geotechnical meeting for the Construction Contract. All services <br />under this section will be performed in accordance to FDOT Specification Section 455. <br />Inspect and verify that the Contractor has performed the foundation work in accordance <br />with applicable FDOT Specification Section 455 and other contract documents. Provide <br />qualified Geotechnical Engineers and CTQP qualified inspectors in Drilled Shaft/Pile <br />Rev. 2/11/2021 <br />