My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-034B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-034B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 11:40:07 AM
Creation date
3/18/2021 9:51:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/09/2021
Control Number
2021-034B
Agenda Item Number
8.E.
Entity Name
Bowman Consulting Group, Ltd.
Subject
Work Order No. 5, for 20 inch Sewer Force Main Relocation
Area
Main Street, Sebastian
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Obtain utility information from non -municipal utilities including gas, telephone, power, <br />cable tv, and any other infrastructure found by consultant to be with in the work area. <br />7. Prepare summary letter of findings. <br />8. Meet with County and present findings and letter. <br />Task 2 — Civil Engineering Design Services (Bowman Consulting) <br />9. Attend and prepare summary meeting notes for up to two (2) meetings, anticipated to be <br />at beginning, and 60% complete milestones of the project. <br />10. Prepare 24" x 36" drawings anticipated to be: <br />Sheet <br />Description <br />G-1 thru 2 <br />Cover Sheet, Construction Notes Sheet (phasing) <br />D-1 thru 2 <br />Details <br />SP -1 thru 2 <br />SWPPP Sheets, Plan and Details <br />U-1 thru 2 <br />Utility relocation drawings including approximately 300' of relocated pipe <br />11. Utilize IRCDUS Utility Construction Standards and supplement with specifications as <br />necessary for the design. <br />12. Provide one (1) engineer's opinion of estimated construction cost with 90% design <br />milestone. Final estimate will match bid schedule. <br />13. Field review design/plans at 90% complete milestone to compare with site conditions. <br />In-house plan checking and respond to Utility's comments and prepare final drawings <br />and specifications. <br />Task 3 — Permitting and Bidding Services (Bowman Consulting) <br />14. Prepare and submit FDEP water and wastewater permits for the project, including <br />requisite application fees. Respond to comments and follow through to final clearance. <br />15. Prepare and submit City of Sebastian right of way permit for utility relocation work <br />withing the Main Street, Including requisite application fees. <br />16. Prepare and submit Railroad right of way permits for utility relocation work withing the <br />Railroad right of way Including requisite application fees. We anticipate the existing <br />pipeline will need to be removed, flagman required during the work. <br />17. Bidding Services are comprised of attending a pre-bid conference, respond to <br />contractor's bid questions and assist with preparation of addenda. <br />
The URL can be used to link to this page
Your browser does not support the video tag.