My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-034B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-034B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 11:40:07 AM
Creation date
3/18/2021 9:51:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/09/2021
Control Number
2021-034B
Agenda Item Number
8.E.
Entity Name
Bowman Consulting Group, Ltd.
Subject
Work Order No. 5, for 20 inch Sewer Force Main Relocation
Area
Main Street, Sebastian
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 - Survey Services (ISS Survey) <br />16. Provide topographic mapping and ortho photos of the project limits suitable for 1" = 20' <br />drawings including route survey, rights of way and easements <br />Task 5 — Utility Locates (Blood Hound) <br />17. Utility soft digs to locate pipe depths within the work area at the connection points and <br />identified crossings. <br />SERVICES AND/OR INFORMATION TO BE PROVIDED BY OTHERS <br />Client or others will provide the following services and/or information: <br />A. County to provide utility easement sketch and legal within work area. <br />B. County to provide utility locates for their facilities <br />C. County will provide the specification front end documents and general provisions. <br />D. County will authorize CEI and Certification under an addendum. Only design, permitting <br />and assisting with bidding will be provided by Consultants with this Work Order. <br />E. County will handle all aspects of public meetings, if any. <br />F. County will mark water and forcemain pipelines so they can be surveyed and potholed by <br />our team. <br />G. Provide record -drawings and information of existing improvements and utility -owned <br />facilities and other substructures. <br />SPECIFIC EXCLUSIONS <br />Specifically not included in the above Scope of Services/Compensation are the following: <br />A. Any geotechnical services. <br />B. Any Environmental services <br />
The URL can be used to link to this page
Your browser does not support the video tag.