My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-034B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-034B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 11:40:07 AM
Creation date
3/18/2021 9:51:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/09/2021
Control Number
2021-034B
Agenda Item Number
8.E.
Entity Name
Bowman Consulting Group, Ltd.
Subject
Work Order No. 5, for 20 inch Sewer Force Main Relocation
Area
Main Street, Sebastian
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. -.. SII. •1• '.. ;t ..-!.3;"'i� �.. <br />TASK i Topographic Survey (As defined in Chapter 5J-17 Administrative Code) <br />A, Using the nearbst published horizontal and vertical control, ISS will establish a minimum of three (3) <br />site control points with NAD 1953 State Plane coordinate values and NAVD 55 vertical values for <br />the collection of data and to be used as site benchmarks. <br />B, Establish all of the of the ROW lines, easement lines and approximate lot lines within the project <br />area. <br />C, Map all above ground existing conditions utilizing conventional survey and GPS real-time kinematic <br />(RTK) methods along the rout®. Collect any marked underground utilities marked by others, <br />D. Fly a predefined route in accordance with all FAA part 107 regulations with a DJI Phantom 4 Pro <br />drone to obtain aerial images. Aerial Images will be processed via PIx4D photogrammetry software <br />for Image only. <br />N/A <br />Ift �c : I - � <br />1 <br />BCG will be responsible for providing the ISS project team the following Items: <br />A, Any available easement Information available. <br />B. Identification and marking of underground utilities. <br />ISS will provide the following deliverables: <br />Task 1- Existing Conditions Map <br />Three (3) copies of signed and sealed survey maps and one (1) digital copy delivered on CD or USB <br />drive, <br />ISS will begin survey field work within two (2) weeks of receiving the signed proposal from BCG. Field <br />work and drafting will be complete within two (2) weeks of Project commencement. Survey map <br />deliverables will be provided to BCG within five (5) days thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.