My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-034B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-034B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 11:40:07 AM
Creation date
3/18/2021 9:51:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/09/2021
Control Number
2021-034B
Agenda Item Number
8.E.
Entity Name
Bowman Consulting Group, Ltd.
Subject
Work Order No. 5, for 20 inch Sewer Force Main Relocation
Area
Main Street, Sebastian
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February, 5 2021 <br />Mr. Eric Flavell, PE, F -ASCE <br />Bowman Consulting Group <br />4450 W. Eau Gaille Blvd., Suits 232 <br />Melbourne, FL 32934 <br />Subject: Proposal to Provide Surveying Services <br />Project No, BWM004 a Sebastian 20" Forcemaln Relocation <br />Dear Mr. Flavell: <br />INFRASTRUCTURE <br />SOLUTION SMIVI0L.5 <br />Infrastructure Solution Services (ISS) is pleased to provide this proposal for surveying services for the <br />Sebastian 20" Forcemain Relocation Route Survey (the "Project") in Sebastian, Florida, for Bowman <br />Consulting Group (BCG). <br />5ECTION 1. HAC <br />After speaking with Mr. Flavell (BCG and reviewing the provided scope and limits, It Is ISS's <br />understanding that the Project consists of a topographic route survey of approximately 500' of FEC <br />(Florida East Coast) railroad Right Of Way (ROW) in Sebastian Florida. The Project Includes the east <br />half of the ROW from the center of the tracks to 15' past the ROW line. The Project will start at 15' north <br />of the north ROW of Main Street and run south for 500'. The area to be surveyed will also include a <br />section of Main Street starting at the center of the train tracks and running east 150' from ROW to <br />ROW. It is our understanding that the Project will Include establishing all ROW lines and approximate <br />lot lines per plat and property appraiser Information to be utilized for the purpose of designing the <br />relocations. All existing utility easements that are identified In the property appraisers research and or <br />provided by the client will also be established. <br />ISS will establish a minimum of three (3) site benchmarks within the project area. The ISS project team <br />will locate all visible aboveground improvements, locate limits of dense vegetation, perform cross <br />sections at intervals no greater than 50' to establish the project topography. Cross sections of lesser <br />Intervals will be performed if the terrain dictates and all grade breaks will be collected. ISS will locate all <br />traffic pavement markings within the Project area. The location of any underground utilities that will be <br />marked by others will be located when all markings are complete. ISS will contact the FEC prior to <br />commencement of work to coordinate access to their property. Mr. Flavell (BCG) has requested a high- <br />resolution georeferenced drone image to be used as a background in the survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.