My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-034B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-034B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 11:40:07 AM
Creation date
3/18/2021 9:51:37 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February, 5 2021 <br />Mr. Eric Flavell, PE, F -ASCE <br />Bowman Consulting Group <br />4450 W. Eau Gaille Blvd., Suits 232 <br />Melbourne, FL 32934 <br />Subject: Proposal to Provide Surveying Services <br />Project No, BWM004 a Sebastian 20" Forcemaln Relocation <br />Dear Mr. Flavell: <br />INFRASTRUCTURE <br />SOLUTION SMIVI0L.5 <br />Infrastructure Solution Services (ISS) is pleased to provide this proposal for surveying services for the <br />Sebastian 20" Forcemain Relocation Route Survey (the "Project") in Sebastian, Florida, for Bowman <br />Consulting Group (BCG). <br />5ECTION 1. HAC <br />After speaking with Mr. Flavell (BCG and reviewing the provided scope and limits, It Is ISS's <br />understanding that the Project consists of a topographic route survey of approximately 500' of FEC <br />(Florida East Coast) railroad Right Of Way (ROW) in Sebastian Florida. The Project Includes the east <br />half of the ROW from the center of the tracks to 15' past the ROW line. The Project will start at 15' north <br />of the north ROW of Main Street and run south for 500'. The area to be surveyed will also include a <br />section of Main Street starting at the center of the train tracks and running east 150' from ROW to <br />ROW. It is our understanding that the Project will Include establishing all ROW lines and approximate <br />lot lines per plat and property appraiser Information to be utilized for the purpose of designing the <br />relocations. All existing utility easements that are identified In the property appraisers research and or <br />provided by the client will also be established. <br />ISS will establish a minimum of three (3) site benchmarks within the project area. The ISS project team <br />will locate all visible aboveground improvements, locate limits of dense vegetation, perform cross <br />sections at intervals no greater than 50' to establish the project topography. Cross sections of lesser <br />Intervals will be performed if the terrain dictates and all grade breaks will be collected. ISS will locate all <br />traffic pavement markings within the Project area. The location of any underground utilities that will be <br />marked by others will be located when all markings are complete. ISS will contact the FEC prior to <br />commencement of work to coordinate access to their property. Mr. Flavell (BCG) has requested a high- <br />resolution georeferenced drone image to be used as a background in the survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.