Laserfiche WebLink
ARCHITECTURAL/ ENGINEERING PROPOSAL <br />FOR A NEW INDIAN RIVER COUNTY <br />TRAFFIC OPERATIONS FACILITY AND STORAGE STRUCTURE <br />March 10, 2021 <br />Page 3 <br />• Development of the on-site drainage calculations and report. It is understood that the project should only require <br />assessment of Pre and Post Impervious areas to ensure the new building project remains within the previously permitted <br />impervious area allotment for the site. Therefore, this contract does not include re -modeling of the existing wet <br />detention pond and surrounding County Complexes. However, should this level of drainage analysis be required, the fee <br />for this additional scope has been provided below in a separate line item.. <br />• Preparation of the site construction drawings. <br />• Preparation of a code compliant landscape plan to incorporate in -fill landscaping as required for the specific addition. <br />• Preparation of the following permit applications: <br />o IRC Pre -Application Conference <br />o IRC Major Site Plan <br />o IRC Stormwater <br />o IRC Utilities <br />o IRC Land Clearing <br />o IRC Initial / Final Concurrency <br />o IRC Fire Review <br />o SJRWMD Permit Modification <br />o IRFWCD Permit Modification <br />• Development of Civil Plans consisting o£ <br />o Cover Sheet <br />o General Notes and Specifications <br />o Existing Conditions Plan <br />o Demolition Plan (Site portion only) <br />o Erosion Control Plan and Details <br />o Site Plan <br />o Paving, Grading and Drainage Plan <br />o Utility Plan <br />o In -fill Landscaping Plan, Landscape Details, Landscape Notes and Specifications <br />o Cross -Sections Plan <br />o Site Details Plan <br />o Paving, Grading and Drainage Details Sheets <br />o Utility Detail Sheets <br />• Submission of civil plans and application packages to permit agencies. <br />• Attendance at the IRC Technical Review Committee meeting. <br />• Revisions to plans per agency comments. <br />• Final construction plans drawings revisions per jurisdictional comments and <br />resubmittal to agencies for final approvals. <br />• Provide review of site portion of project cost estimate as provided by Architect. <br />• Construction Administration & Certifications to be provided by the County. <br />Architectural/Engineering Basic Services and Civil Services Fees shall be broken down as stated below. <br />The Basic Services Fees shall include Basic Services for Architectural, Structural, Mechanical, Electrical and <br />Plumbing Services. <br />BASIC SERVICES: <br />Architectural Services...............................................................'..$163,000.00 <br />Structural Engineering.................................................................$ 15,250.00 <br />MEP Engineering .......................................... ..$ 35,500.00 <br />Sub -Total $213,750.00 <br />Civil Services (not including E & F below) ........................................... $ 48,150.00. <br />Total $261, 900.00 <br />Reimbursable Expenses.............................................................. $ 50,000.00 <br />D® N A D I <br />& Associates, Architects, P.A. <br />