My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/13/1995
CBCC
>
Meetings
>
1990's
>
1995
>
6/13/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:11 PM
Creation date
6/16/2015 2:38:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/13/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />mu 95 f-AcE 445 <br />exceed $2,500.00. This work is included in the $40,000.00 budgeted <br />amount and will be handled with a purchase order. Funding for this <br />project will be from the renewal and replacement fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval <br />of the above outlined project and expenditures as presented. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Tippin, the Board unanimously approved <br />the -Underground Fuel Storage Tank Removal and <br />Replacement project and expenditures, as recommended <br />by staff. <br />EMERGENCY WATER MAIN RELOCATION - 43RD AVENUE AND 51H <br />STREET SOUTHWEST <br />The Board reviewed a Memorandum of June 6, 1995: <br />DATE: JUNE 6, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. c <br />AND STAFFED CAPITAL PR S ENGINEER <br />BY: DEPAR F UTILITY SERVICES <br />SUBJECT: EMERG MAIN RELOCATION <br />43RD VENUE AND 5TH STREET, SW <br />BACKGROUND AND ANALYSIS <br />In the first week of May 1995, we were notified by Public Works of a <br />conflict with a paving and drainage project at the above -referenced <br />site. The conflict resulted from a requirement by Indian River <br />Farms to increase the east/west culvert under 43rd Avenue from an <br />existing 24 inches to a 48 -inch pipe. The Utilities Department, in <br />an effort not to delay the Public Works project, has designed a pipe <br />modification,to accommodate the required work and has acquired <br />quotes from three contractors for this work as follows: (See <br />attached quotes.) <br />1) Treasure Coast Contracting, Inc. $22,650.00 <br />2) Hall Contracting Corporation $26,641.90 <br />3). Speegle Construction, Inc. $28,950.00 <br />To expedite this work, we are requesting authorization to issue a <br />purchase order with the low bidder, Treasure Coast Contracting, <br />Inc., so that the relocation can commence immediately. Funding for <br />this project will be from the renewal and replacement fund. <br />RECOM ENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the project as outlined above. <br />JiJNE 139 1995 <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.