RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the execution of the attached <br />agreement, which approves Work Authorization No. 31, with <br />Driveways, Inc., to construct the water line replacement in the <br />amount of $46,823.97 to replace an estimated total of 200 linear - <br />feet of water main, 1,395 linear feet of laterals and 85 meter <br />connections and authorizes. expenditure of $40,165.86 for materials <br />and in-house support, for a total project cost of $86,989.83. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />Work Authorization No. 31 with Driveways, Inc., for <br />a total project cost of $86,989.83, as recommended <br />by staff. <br />AUTHORIZATION IS ON FILE IN THE OFFICE OF THE CLERK <br />TO THE BOARD <br />NORTH BEACH R.O. PLANT - UNDERGROUND FUEL STORAGE <br />TANK REMOVAL AND REPLACEMENT <br />The Board reviewed a Memorandum of May 9, 1995: <br />DATE: MAY 9, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTIL SERVICES <br />PREPARED WILLIAM Mc N <br />AND STAFFED CAPITAL CTS ENGINEER <br />BY: DEPAR F UTILITY SERVICES <br />SUBJECT: NORTH MCH R.O. PLANT <br />UNDERGROUND FUEL STORAGE TANK REMOVAL AND REPLACEMENT <br />BACKGROUND <br />This is a budgeted renewal and replacement project for the- year <br />1995. Both state and federal regulations are now requiring <br />municipalities to retrofit all underground fuel storage tanks with <br />above ground facilities. The regulations on tank removal are now <br />more stringent than ever and require that the contractor be licensed <br />to perform the required tank removal. As a result of this, we must <br />prepare contract specifications and bid documents for this project. <br />The engineering associated with this work will be accomplished <br />in-house. <br />ANALYSIS <br />This project has been budgeted at a cost of $40,000.00, and the <br />department feels confident that this will not be exceeded. The <br />project includes tank removal and the above ground ., tank <br />installation. Also, as part of this project, we will be bringing <br />both a level indicator signal and a containment breach signal back <br />into the plant's computer system for monitoring and alarm status. <br />This will require connection to the plant's main control computer. <br />W3 propose to have the connection and programming service performed <br />by our control maintenance group, HTS, Inc., An an amount not to <br />JUM 139 1995 104 b®®K 1 95 FAct,444 <br />