Laserfiche WebLink
Mr. Scott Reynolds <br />March 17, 2021 <br />Page 4 <br />Task <br />Timeline <br />Notice to Proceed (NTP) <br />March 17, 2021 <br />Well Abandonment Completed <br />May 17, 2021 <br />Supplemental Site Assessment activities completed <br />As needed <br />Draft Site Assessment Report submitted to IRCDUS <br />Upon completion of <br />the delineation <br />Final. Site Assessment Report submitted to IRCDUS (assumes 7 calendar day <br />IRCDUS review) <br />ASSUMPTIONS <br />Tetra Tech's scope of services and project costs were developed with the following assumptions: <br />• Tetra Tech will review available data provided by Indian River County. <br />• Surveying services are not included. <br />• Permitting fees are not included in this proposal. <br />• The cost proposal does not include any remediation or investigation activities that are not <br />specifically described herein. Additional assessment and remediation may be required. <br />• A Sunshine State One -Call request for subsurface utility location will be completed. This <br />proposal assumes there are no utilities in the vicinity of the USTs. Any utilities in this <br />area must be identified by IRCDUS. Tetra Tech is not responsible for the damage to <br />subsurface infrastructure that is not identified by IRCDUS prior to Tetra Tech initiating <br />AST Closure or Site Assessment activities. <br />• "Face-to-face" meetings with regulators are not proposed as part of this work. <br />• It is assumed that additional restrictions or limitations as a result of COVID-19, weather, <br />or other unforeseen circumstances will not inhibit Tetra Techs level of effort or schedule. <br />• Tetra Tech assumes that Draft reports will have only minor edits by IRCDUS. <br />• Tetra Tech assumes IRCDUS will provide ready access to the Site as needed. <br />PROJECT COST <br />The estimated: costs are based on our current understanding of the project requirements and best <br />estimates of level of effort required to perform the basic services and may be subject to change <br />upon agreement between Indian River County and Tetra Tech. The estimated project costs are <br />shown in the attached Table 1. This project'would be provided as lump sum per task not to <br />exceed $23,550.90, and additional time and materials tasks not to exceed $4,325.32. <br />TE'TR A TECH <br />